Connecting Operator to Post Bracket Assembly
Step 7:
Tap the rear mount onto the back of the operator. Align the 3/8" hole in the rear mount with 3/8" hole in the back of the operator and insert the 3/8" bolt through the holes and secure it with the lock nut.
Rear Mount
|
| Step 8: |
| Post Pivot Brackets | Position rear mount between post pivot |
| brackets. Place 1/ " washers between | |
|
| |
|
| 2 |
|
| rear mount and post pivot brackets. |
|
| Align 1/2" hole in rear mount and |
|
| washers with holes in post pivot |
|
| brackets. Attach the rear mount to post |
|
| pivot brackets using 1/2" x 23/4" bolt |
|
| and 1/ " nut. Note: when tightening |
|
| 2 |
|
| the rear mount bolt, leave it loose |
|
| enough for the operator to pivot |
| Rear Mount | freely. |
|
| |
1/2" Washers |
|
|
Step 9: |
| Clevis Pin |
Attach the gate bracket to the front |
| |
|
| |
mount using the clevis pin and hairpin |
|
|
clip. | Gate Bracket | |
| Front Mount |
IMPORTANT: Thin walled tube and panel gates MUST be reinforced as shown to prevent damage to gate and operator.
Hairpin Clip
14