GTO RB923 rev Connecting Operator to Post Bracket Assembly, 1/ nut. Note when tightening, Freely

Page 17

Connecting Operator to Post Bracket Assembly

Step 7:

Tap the rear mount onto the back of the operator. Align the 3/8" hole in the rear mount with 3/8" hole in the back of the operator and insert the 3/8" bolt through the holes and secure it with the lock nut.

Rear Mount

 

 

Step 8:

 

Post Pivot Brackets

Position rear mount between post pivot

 

brackets. Place 1/ " washers between

 

 

 

 

2

 

 

rear mount and post pivot brackets.

 

 

Align 1/2" hole in rear mount and

 

 

washers with holes in post pivot

 

 

brackets. Attach the rear mount to post

 

 

pivot brackets using 1/2" x 23/4" bolt

 

 

and 1/ " nut. Note: when tightening

 

 

2

 

 

the rear mount bolt, leave it loose

 

 

enough for the operator to pivot

 

Rear Mount

freely.

 

 

1/2" Washers

 

 

Step 9:

 

Clevis Pin

Attach the gate bracket to the front

 

 

 

mount using the clevis pin and hairpin

 

 

clip.

Gate Bracket

Push-Pull Tube

 

Front Mount

IMPORTANT: Thin walled tube and panel gates MUST be reinforced as shown to prevent damage to gate and operator.

Hairpin Clip

14

Image 17
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserEntrapment Protection Required Safety Precautions for Swing GatesInstall Warning Signs Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListStep Preparing the GatePull-to-Open Single Gate gate opens into the property Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemEstimated Maximum Number of Cycles Per Day Splice wires togetherSolar Zones and Gate Activity Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Remove the Transmitter Cover Setting the Personal Transmitter CodeSet the transmitter DIP Switches Run the cable through PVC conduit to protect it from damage Mounting the ReceiverMemory For Push-to-Open Installations Setting the Closed Position Limit SwitchStep For Pull-to-Open Installations Step Connecting Additional Safety Devices Photoelectric Beams Compatible Safety DevicesSafety Edges WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenStep PTO-2 Push-to-Open InstallationStep PTO-1 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage GTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Warranty and Repair ServiceLimited Two Year Warranty Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 GTO Nema Box FM317 Accessories Available Through Your DealerRB101 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list