GTO RB923 rev installation manual Installing the Open and Closed Position Stops

Page 19

Installing the Open and Closed Position Stops

The positive stops hold the gate firmly in the open and closed positions. The positive stops also form the boundaries of the gate operating arc and help stabilize the gate. Moreover, a stable gate helps to maintain the long life of your automatic gate opener system. To further enhance the stability and security of your gate, install the optional GTO Automatic Gate Lock (see Accessory Catalog).

Step 13:

With the gate still in the open position, measure approxi- mately 3/4 of the distance to the end of the gate from the hinges and place a mark on the ground directly under the gate (refer to the overview illustration below for positioning). You will install an open-position stop post at this point. The open position stop post can be made of wood, metal, or concrete.

Closed Position Stop

Open Position Stop

Step 14:

Remove the hairpin clip and clevis pin from the gate bracket and move the gate so that you can install the open position stop post. Secure stop post in the ground (and seat in concrete).

 

Clevis Pin

 

Push-Pull Tube

Gate Bracket

Front Mount

 

Hairpin Clip

16

 

Image 19
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step Enough for the operator to pivot Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Rear mount bolt, leave it looseInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams ORG orange used with GRN green Connecting AccessoriesWHT white used with GRN green BLU blue used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-6 Step PTO-3Step PTO-4 Step PTO-5Maintenance Maintenance and Troubleshooting GuidePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListStepD2 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog Step D1Step D-5 Connecting the Second Operator to the Control BoardStepD3 Step D-4Step D-9 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-8Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 Master Pin Lock RB975 ACCESS-ories433IH RB509Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list