Push-to-Open Installation
Determining The Mounting Position of The Post Bracket Assembly
Swinging gates shall not open into public access areas! Review IMPORTANT SAFETY INSTRUCTIONS
A
Step PTO-1:
The operator and brackets are installed on the gate post in the same way as
Open Position
Step PTO-2:
Find a position for the post pivot brackets where the operator has clearance in both the open and closed positions and clamp operator into position (see examples of clearance on page 15; step 10). Mark the point on the post pivot bracket where the 1/2" holes will need to be drilled. Drill the holes then secure the post pivot bracket using the 1/2" bolt, spacer, washer and lock nut.
Clearance
Closed Position
New Hole Position
Spacer
31