GTO RB923 rev installation manual Control Board Settings, DIP Switches

Page 25

CONTROL BOARD SETTINGS

DIP Switches

The four DIP switches on the control board match the operator with the type of gate on which it is installed. For example, gates may pull-to-open or push-to-open. Prior to packaging, the GTO/PRO 2000 series control board was configured for single swing gates that pull-to-open (open into the prop- erty). If your gate type matches this configuration, you DO NOT need to adjust the DIP switches; Proceed to the Potentiometers section on the next page.

NOTE: To change the DIP switch settings, you must turn

 

 

 

 

the control box power switch OFF; move the switch; then

 

 

 

 

 

 

 

 

 

 

 

turn the power back ON. Use a small screwdriver to move

 

 

DIP switches

the switches.

 

 

 

 

 

 

 

 

PULL/PUSH: Set to PULL for swing gates that pull-to-

 

 

PULL/PUSH

open [factory setting]; PUSH for swing gates that push-to-

 

 

 

 

SNGL/DUAL

open (see Push to Open Installation on pages 31-32).

 

 

SEQ1

 

 

SEQ2

NOTE: The direction a gate opens is determined by standing

 

 

 

 

 

 

 

 

 

 

 

 

inside the property and facing toward the gate.

 

 

 

 

 

 

SNGL/DUAL: Set to SNGL for a single gate leaf [factory

 

 

 

 

 

 

setting]; DUAL for dual gate leaves.

 

 

 

 

 

 

 

 

 

 

 

SEQ1: Controls the opening order of dual gate leaves. See

 

 

 

 

Dual Gate System Installation on page 40 for more infor-

 

 

 

 

mation. (the factory setting is OFF).

 

 

 

 

SEQ2: Controls the opening order of dual gate leaves. See Dual

 

 

 

 

Gate System Installation on page 40 for more information

 

 

 

 

(the factory setting is OFF).

 

 

 

 

 

 

 

4

 

 

 

 

3

 

 

 

 

 

 

 

 

2

 

 

 

 

 

ON

 

 

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTRUCT

 

SENS.

MIN

MAX

LEARN

PWR

.

SW

.

 

 

 

 

 

 

 

 

+

BATT

 

18VA

C

SO

LA

R

RED

BLK

ORG BLU GRN CLS

OPN

RED BLK

ORG BLU

GRN

CLSEDG

OPNEDG

 

 

 

 

 

 

 

 

 

 

+

 

 

 

 

 

 

 

 

 

~

 

 

 

 

 

 

 

 

 

~

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPERATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SECOND

 

 

 

 

 

 

 

 

FIRST

OPERATOR

 

 

 

 

 

 

 

 

IN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

POWER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AUTOCLOSE

 

 

 

 

 

 

 

60

 

STATUS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120

 

 

 

 

 

 

OFF

 

 

 

 

 

 

 

 

INERTIA

 

 

 

 

 

 

 

 

MAX

 

 

 

 

 

 

MIN

 

 

 

 

 

 

 

 

OBSTRUCT

 

 

 

 

 

 

 

SENS

.

 

 

 

 

 

 

 

 

PU

LL/P

USH

 

 

 

 

MAX

 

 

MIN

 

 

 

 

 

 

 

GL/DUAL

 

 

 

 

 

SN

 

SEQ1

 

 

 

LEARN

 

 

SEQ2

 

 

 

GRN

WHT

 

 

 

 

ORG BLU

R

B

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RCVR

 

ALARM

ACCESSORY

 

 

 

 

 

 

 

 

 

 

 

 

22

Image 25
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list