Step 15:

Close the gate. Position the closed position stop plate on the end of the gate frame at mid-height. Extend the stop plate to make contact with the fence post at that position.

Install the closed position stop plate using appropriate hardware for the type of gate (U-bolts for tube or chain link gate, wood or lag screws for wood gates, etc.). This hardware is not provided.

Reattach the operator to the gate bracket.

Mounting the Control Box

Step 16:

Mount the control box using the nylon cable ties

(provided) or another secure mounting method. The control box must be mounted at least 3 feet above the ground to protect it from rain splash, snow, etc., and at least 3 feet from an ac power source to prevent electrical interference.

Hinge point

Closed Position

Stop Plate

The gate must open no more than 110°

Wood, metal or concrete post set in concrete.

Open Position Stop

SIDE VIEW

Closed Position Stop Plate mounted

on metal post with u-bolts.

 

Gate Post

Fence Post

 

 

TOP VIEW

17

Image 20
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateEntrapment Protection Required Safety Precautions for Swing GatesInstall Warning Signs Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsStep Preparing the GatePull-to-Open Single Gate gate opens into the property Installing The Post Bracket Assembly Step Connecting Operator to Post Bracket Assembly 1/ nut. Note when tighteningRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthEstimated Maximum Number of Cycles Per Day Splice wires togetherSolar Zones and Gate Activity Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Remove the Transmitter Cover Setting the Personal Transmitter CodeSet the transmitter DIP Switches Run the cable through PVC conduit to protect it from damage Mounting the ReceiverMemory For Push-to-Open Installations Setting the Closed Position Limit SwitchStep For Pull-to-Open Installations Step Connecting Additional Safety Devices Photoelectric Beams Compatible Safety DevicesSafety Edges Connecting Accessories WHT white used with GRN greenBLU blue used with GRN green ORG orange used with GRN greenStep PTO-2 Push-to-Open InstallationStep PTO-1 Step PTO-3 Step PTO-4Step PTO-5 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage GTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Warranty and Repair ServiceLimited Two Year Warranty Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemInstalling The Second Unit GTO Automatic Gate Lock see Accessory CatalogStep D1 StepD2Connecting the Second Operator to the Control Board StepD3Step D-4 Step D-5Setting the Control Board for Dual Gate Installations Step D-7Step D-8 Step D-9Step D-11 GTO Nema Box FM317 Accessories Available Through Your DealerRB101 ACCESS-ories 433IHRB509 Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class