GTO RB923 rev installation manual Column Installation Information

Page 39

Column Installation Information

The GTO/PRO 2000 and GTO/PRO 2200 can be mounted on any size column, but the gate hinge cannot be more than 12” from the mounting surface of the post bracket. The edge of the post bracket must be aligned with the edge of the column face where the hinges are mounted. If these conditions cannot be met, and you do not want to pocket the column, call GTO’s Service Department for alternative solutions..

In column applications, the rear mount of the operator will be attached directly to the gate bracket without the use of the post pivot brackets. Use ten 1/2” washers (provided) as spacers between the rear mount and the gate bracket, 5 on top and 5 on bottom (see illustration below). Align washers, rear mount holes and gate bracket holes, then secure with 1/2" x

33/4" bolt and lock nut. When tightening the 1/2" nut, leave it just loose enough for the arm to swing freely.

Nylon Spacer

Nylon Spacer

36

12" MAX

Be sure there is clearance in both the open and closed position.

Image 39
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step Enough for the operator to pivot Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Rear mount bolt, leave it looseInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams ORG orange used with GRN green Connecting AccessoriesWHT white used with GRN green BLU blue used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-6 Step PTO-3Step PTO-4 Step PTO-5Maintenance Maintenance and Troubleshooting GuidePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListStepD2 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog Step D1Step D-5 Connecting the Second Operator to the Control BoardStepD3 Step D-4Step D-9 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-8Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 Master Pin Lock RB975 ACCESS-ories433IH RB509Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list