GTO RB923 rev installation manual III. After Installation

Page 6

IMPORTANT SAFETY INSTRUCTIONS

III.After Installation

1.Review ALL safety instructions with the consumer/end user. Explain the basic operation and safety systems of the entire gate operator system, including disconnecting the operator for manual operation of the gate.

2.Attach the warning signs (included) to each side of the gate to alert public of automatic gate operation. Take a photo of warning signs installed on gate. Record the date of the photo for your reference.

3.SAVE THESE INSTRUCTIONS.

Leave a copy of the IMPORTANT SAFETY INSTRUCTIONS section of this manual with the consumer/end user.

3

Image 6
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step Rear mount bolt, leave it loose Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams BLU blue used with GRN green Connecting AccessoriesWHT white used with GRN green ORG orange used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-5 Step PTO-3Step PTO-4 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemStep D1 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog StepD2Step D-4 Connecting the Second Operator to the Control BoardStepD3 Step D-5Step D-8 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-9Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 RB509 ACCESS-ories433IH Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class