GTO RB923 rev Setting the Closed Position Limit Switch, Step For Pull-to-Open Installations

Page 29

Setting the Closed Position Limit Switch

Step 29:

Remove the rear cover of the operator to gain access to the limit switches and the limit switch cams.

IMPORTANT: The inner switch cam assembly is factory set. Do not attempt to adjust the inner switch cam. This switch cam is not adjustable; attempting to move it will cause damage to the operator!

Step 30:

For Pull-to-Open Installations:

The open position of the gate was determined when you installed the GTO/PRO 2000 on the open gate (page 15, Step 12). The outer switch cam is used to adjust the CLOSED POSITION of the gate. The ideal closed position is when the closed position stop plate makes contact with the fence post just as the operator motor shuts down. Turn the cam until the desired setting is accomplished. Test adjust- ments by using transmitter.

For Push-to-Open Installations:

The closed position of the gate was determined when you installed the GTO/PRO 2000 on the closed gate (see page 32). The outer switch cam is used to adjust the OPEN POSITION of the gate. The ideal open position is when the gate makes contact with the open position stop post just as the operator motor shuts down. Turn the cam until the desired setting is accomplished. Test adjustments by using transmitter.

NOTE: Some adjustment to the closed position can be made by disconnecting the operator from the gate bracket and rotating the push/pull tube to extend or shorten the operator length.

CAUTION: Because this operator is a powerful device, it is extremely important to properly set the limit switch. Keep the transmitter at hand during this operation in case you need to start or stop the operator to prevent harm to people or your gate.

Inner Limit Switch Cam (fixed position)

DO NOT ADJUST!

Outer Limit Switch Cam (Adjustable)

Z-Clip

Limit Switches

26

Image 29
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserEntrapment Protection Required Safety Precautions for Swing GatesInstall Warning Signs Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListStep Preparing the GatePull-to-Open Single Gate gate opens into the property Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemEstimated Maximum Number of Cycles Per Day Splice wires togetherSolar Zones and Gate Activity Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Remove the Transmitter Cover Setting the Personal Transmitter CodeSet the transmitter DIP Switches Run the cable through PVC conduit to protect it from damage Mounting the ReceiverMemory For Push-to-Open Installations Setting the Closed Position Limit SwitchStep For Pull-to-Open Installations Step Connecting Additional Safety Devices Photoelectric Beams Compatible Safety DevicesSafety Edges WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenStep PTO-2 Push-to-Open InstallationStep PTO-1 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage GTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Warranty and Repair ServiceLimited Two Year Warranty Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 GTO Nema Box FM317 Accessories Available Through Your DealerRB101 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list