GTO RB923 rev installation manual Access -ories, Replacement Batteries

Page 47

ACCESS -ories

Standard Replacement Transformer (RB570) – Standard 18 Volt, 40 VA, AC transformer for chargingthe battery included with the GTO/PRO 2000 series gate operators.

Bulldog Replacement Charger (RB421) – Standard 12 volt DC charger (not shown) for maintaining battery included with the Bulldog Pedestrian Gate Lock.

Replacement Batteries

RB500 – The standard 12 volt, 7.0 ampere-hour, maintenance-free battery for all GTO/PRO gate operators. This is the only battery approved for use with GTO gate operators. Battery life 3 to 5 years.

RB422 –The 12 volt, 1.2 ampere-hour version for use with the Bulldog

Pedestrian Gate Lock.

Replacement Receivers

The AQ201: Receiver with a 10 ft. cable (included).

The AWQ325: Receiver with a 25 ft. cable.

The AWQ350: Receiver with a 50 ft. cable.

The AWQ400: Receiver with a 100 ft. cable.

Standard Replacement Power Cables for Gate Operators

The PRO 6C (AW209): 6 ft. power cable included with GTO/PRO 2000 single gate operators.

The PRO 50C (AW210): 50 ft. power cable included with GTO/PRO 2200 dual (second) gate operators.

40 Amp Hour Battery Kit (FB296)

This large 12 volt, 40 ampere-hour, maintenance-free battery is for the Mighty Mule gate operators. It will supply additional power for increasing the number of open and close cycles. The kit comes with the battery and wiring harness for easy installation. Battery life 3 to 5 years.

GTO, Inc. gate operator accessories are warranted by the manufacturer against defects in materials and workmanship for a period of one year, unless otherwise stated, from the date of purchase provided recommended installation procedures have been followed. Warranty is considered void if damage was due to improper installation or use, connection to an improper power source, or was caused by lightning, wind, fire, flood, insects, or other natural agent.

44

Image 47
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserEntrapment Protection Required Safety Precautions for Swing GatesInstall Warning Signs Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListStep Preparing the GatePull-to-Open Single Gate gate opens into the property Installing The Post Bracket Assembly Step Enough for the operator to pivot Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Rear mount bolt, leave it looseInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemEstimated Maximum Number of Cycles Per Day Splice wires togetherSolar Zones and Gate Activity Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Remove the Transmitter Cover Setting the Personal Transmitter CodeSet the transmitter DIP Switches Run the cable through PVC conduit to protect it from damage Mounting the ReceiverMemory For Push-to-Open Installations Setting the Closed Position Limit SwitchStep For Pull-to-Open Installations Step Connecting Additional Safety Devices Photoelectric Beams Compatible Safety DevicesSafety Edges ORG orange used with GRN green Connecting AccessoriesWHT white used with GRN green BLU blue used with GRN greenStep PTO-2 Push-to-Open InstallationStep PTO-1 Step PTO-6 Step PTO-3Step PTO-4 Step PTO-5Maintenance Maintenance and Troubleshooting GuidePage GTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Warranty and Repair ServiceLimited Two Year Warranty Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListStepD2 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog Step D1Step D-5 Connecting the Second Operator to the Control BoardStepD3 Step D-4Step D-9 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-8Step D-11 GTO Nema Box FM317 Accessories Available Through Your DealerRB101 Master Pin Lock RB975 ACCESS-ories433IH RB509Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list