GTO RB923 rev installation manual Installing the Gate Bracket

Page 18

Step 10:

Open the gate to the desired position (at least 10º and no greater than 110º). Position the operator so that the gate bracket just rests against the gate. Check the clearance between the operator and the gate. The operator should only make contact with the gate at the gate bracket. However, there should not be too much clearance between the operator and the gate, or the operator will fully extend before it reaches the closed position. See illustra- tion at right for examples of clearance.

Step 11:

Now align spacer and post pivot brackets hole with the post bracket hole that provides the best clearance. Insert the 1/2" x 33/4" bolt through holes in post bracket, post pivot brackets and spacer. When tightening the 1/2" nut, leave it loose enough so that you can make adjustments later.

Spacer

Installing the Gate Bracket

NOTE: Rotating the front mount at the end of the push-pull tube will change its length so that the mount and gate bracket can be properly aligned with each other on the gate at the best location (i.e. between or on pickets, on braces, mounting plate, etc.).

Step 12:

With the gate bracket clamped in the open position (no more than 110o from the closed position). Detach the operator from the gate bracket. The mounting holes should be centered over the scribe line. Drill the 1/2" holes in the gate cross member and attach the gate bracket using the 1/2" x 23/4" bolts, washers and nuts. Reattach the operator to the gate bracket. You have now established the OPEN POSITION of the gate.

15

Image 18
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step Rear mount bolt, leave it loose Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams BLU blue used with GRN green Connecting AccessoriesWHT white used with GRN green ORG orange used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-5 Step PTO-3Step PTO-4 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemStep D1 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog StepD2Step D-4 Connecting the Second Operator to the Control BoardStepD3 Step D-5Step D-8 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-9Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 RB509 ACCESS-ories433IH Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class