GTO RB923 rev installation manual Table of Contents

Page 3

Table of Contents

Gate Operator Class Categories -----------------------------------------

inside front cover

Units and Standards Conversion Chart ---------------------------------

inside front cover

IMPORTANT SAFETY INSTRUCTIONS -------------------------------------

page 1

Warning Signs and Labels ----------------------------------------------------------

page 7

Technical Specifications -------------------------------------------------------------

page 8

Single Gate Operator Parts List ---------------------------------------------------

page 9

Single Gate Operator Installation -----------------------------------------------

page 11

Preparing the Gate ---------------------------------------------------------------

page 11

Installing the Post Bracket Assembly -----------------------------------------

page 12

Connecting Operator to Post Bracket Assembly -----------------------------

page 14

Installing the Gate Bracket ------------------------------------------------------

page 15

Installing the Open and Closed Position Stops -------------------------------

page 16

Mounting the Control Box ------------------------------------------------------

page 17

Powering the System ------------------------------------------------------------

page 19

Solar Zones and Gate Activity -------------------------------------------------

page 20

Control Boards Settings -----------------------------------------------------------

page 22

Setting the Personal Transmitter Code -----------------------------------------

page 24

Mounting the Receiver -------------------------------------------------------------

page 25

Setting the Closed Position Limit Switch ---------------------------------------

page 26

Connecting Additional Safety Devices ------------------------------------------

page 28

Compatible Safety Devices -----------------------------------------------------

page 29

Connecting Accessories ------------------------------------------------------------

page 30

Push-To-Open Installation --------------------------------------------------------

page 31

Maintenance and Troubleshooting Guide -------------------------------------

page 33

Warranty and Repair Service ----------------------------------------------------

page 35

Column Installation Information ------------------------------------------------

page 36

Dual Gate System Installation ----------------------------------------------------

page 37

Setting the Control Board for Dual Gate Installations ----------------------

page 40

Accessory Catalog -------------------------------------------------------------------

page 42

Installation Check List -------------------------------------------------------

Back Cover

Image 3
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step Enough for the operator to pivot Connecting Operator to Post Bracket Assembly1/ nut. Note when tightening Rear mount bolt, leave it looseInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams ORG orange used with GRN green Connecting AccessoriesWHT white used with GRN green BLU blue used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-6 Step PTO-3Step PTO-4 Step PTO-5Maintenance Maintenance and Troubleshooting GuidePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListStepD2 Installing The Second UnitGTO Automatic Gate Lock see Accessory Catalog Step D1Step D-5 Connecting the Second Operator to the Control BoardStepD3 Step D-4Step D-9 Setting the Control Board for Dual Gate InstallationsStep D-7 Step D-8Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 Master Pin Lock RB975 ACCESS-ories433IH RB509Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list