GTO RB923 rev installation manual Step

Page 16

Step 4:

Position the post bracket on the fence post with the mounting holes centered over the scribe line. The post bracket should be flush with the edge of the fence post closest to the gate (see illustration). Mark the position of post bracket holes on the fence post.

Step 5:

Drill holes in fence post as marked using a 1/2" drill bit. Install the post bracket using the 1/2" x 10" carriage bolts, 1/2" washers, and lock nuts (provided).

Post Bracket

Step 6:

Place the rounded ends of post pivot brackets inside the post bracket. Align the holes in the post pivot brackets with holes in the post bracket (see illustration). Insert 1/2" x 33/4" hex head bolt through post pivot brackets and post bracket; tighten the nut.

Post Pivot Brackets

13

Image 16
Contents Series Converting Temperature Table of Contents Important Safety Instructions Disconnecting the OperatorBefore Installation II. During InstallationIII. After Installation Entrapment Alarm UL 325 30A.1.1A Secondary Means of Protection Against EntrapmentConsumer/End User No ONE should Cross the Path of the Moving GateInstall Warning Signs Required Safety Precautions for Swing GatesEntrapment Protection Moving Gate Can Cause Injury Or Death Technical Specifications GTO/PRO 2000 Series Swing Gate OperatorsParts Hardware not to scaleSingle Gate Operator Parts List Control Box and Electrical ComponentsPull-to-Open Single Gate gate opens into the property Preparing the GateStep Installing The Post Bracket Assembly Step Connecting Operator to Post Bracket Assembly 1/ nut. Note when tighteningRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Never insert the battery with the terminals to the right BatteryPowering the System Gate LengthSolar Zones and Gate Activity Splice wires togetherEstimated Maximum Number of Cycles Per Day Make sure the exposed wires do not touch each other Not touch each otherControl Board Settings DIP SwitchesPotentiometers Set the transmitter DIP Switches Setting the Personal Transmitter CodeRemove the Transmitter Cover Memory Mounting the ReceiverRun the cable through PVC conduit to protect it from damage Step For Pull-to-Open Installations Setting the Closed Position Limit SwitchFor Push-to-Open Installations Step Connecting Additional Safety Devices Safety Edges Compatible Safety DevicesPhotoelectric Beams Connecting Accessories WHT white used with GRN greenBLU blue used with GRN green ORG orange used with GRN greenStep PTO-1 Push-to-Open InstallationStep PTO-2 Step PTO-3 Step PTO-4Step PTO-5 Step PTO-6Maintenance and Troubleshooting Guide MaintenancePage Limited Two Year Warranty Warranty and Repair ServiceGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information Second Unit Parts List GTO/PRO 2200 Dual Gate SystemInstalling The Second Unit GTO Automatic Gate Lock see Accessory CatalogStep D1 StepD2Connecting the Second Operator to the Control Board StepD3Step D-4 Step D-5Setting the Control Board for Dual Gate Installations Step D-7Step D-8 Step D-9Step D-11 RB101 Accessories Available Through Your DealerGTO Nema Box FM317 ACCESS-ories 433IHRB509 Master Pin Lock RB975Access -ories Replacement BatteriesInstallation Check list Installation of this operator conforms to Class