Step 17
Make sure the control box power switch is in the OFF position. Unscrew and remove the control box cover and slide the battery into position with its terminals to the left (see illustration). Push battery down until it fits snugly in control box. Connect the BLACK battery wire to the NEGATIVE
Pay close attention to the color of the wires. If the wires are connected incorrectly, the control board will be damaged.
NEVER insert the battery with the terminals to the right.
RED wire to POSITIVE (+) terminal
RED
BLACK
BLACK wire to NEGATIVE
HINT: A dab of household petroleum jelly on the battery terminals will help prevent corrosion.
Step 19
Insert the stripped power cable wires into the appropriate terminals on the FIRST OPERATOR terminal block. The green wire should be inserted into the GRN terminal, the blue wire into BLU, the orange wire into ORG, black wire into BLK, and the red wire into the RED terminal.
Tighten the set screws against the end of the wires. A dab of petroleum jelly on each terminal will help prevent corrosion.
Step 18
Strip approximately 3/16" of insulation from each wire of the power cable. Twist each exposed wire tightly (there are five [5] wires inside the power cable sheath). Remove lock nut from strain relief hub. Insert strain relief hub and sealing nut (along with power cable) into hole on bottom of control box. Thread approximately 4" of the power cable into the control box and retighten lock nut and sealing nut until the power cable locks into place.
|
|
|
|
|
|
|
|
|
|
|
|
|
| AU |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| CLOSE |
|
|
| + |
|
|
|
|
|
|
|
|
|
|
| INERTIA | 12 V Battery |
|
|
|
|
|
|
|
|
|
|
|
|
|
| SENS. | |
|
|
|
|
|
|
|
|
|
|
|
|
|
| OBSTR. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| LEARN |
|
1~8VAC~ SO– LA+R | RED | BLK | ORG | BLU | GRN | EDGCLS | EDGOPN | RED BLK ORG BLU GRN EDGCLS EDGOPN | GRN | ORG | BLU | WHT | R | G B |
|
ALARM | ACCESSORY |
| |||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| RCVR |
|
|
|
|
|
|
|
|
| SECOND OPERATOR |
|
|
|
|
|
|
|
POWER IN | FIRST OPERATOR |
|
|
|
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Strain Relief | Relief | Lock Nut |
| ||
Strain |
| |
| Hub | |
|
| |
Operator Power Cable |
| Sealing Nut |
|
|
18VAC SOLAR ~ ~ – +
POWER IN
|
|
|
|
|
|
|
|
| SEQ1 |
|
|
| OPN EDG |
|
| CLS EDG OPN EDG |
| SEQ2 | |
RED | BLK ORG BLU GRN | CLS EDG | RED | BLK ORG BLU GRN | GRN | ORG | BLU WHT | ||
FIRST OPERATOR |
| SECOND OPERATOR | ALARM ACCESSORY |
LEARN
R | B | G |
| RCVR |
Correct
Terminal Wire Block
Wrong
Terminal Wire Block
Wrong
Terminal Wire Block
Power Cable
from First Operator
Step 20: Verify that the control box power switch is OFF before proceeding to the next step!
18