GTO RB923 rev Never insert the battery with the terminals to the right, Battery

Page 21

Step 17

Make sure the control box power switch is in the OFF position. Unscrew and remove the control box cover and slide the battery into position with its terminals to the left (see illustration). Push battery down until it fits snugly in control box. Connect the BLACK battery wire to the NEGATIVE () battery terminal. Connect the RED battery wire to the POSITIVE (+) terminal.

Pay close attention to the color of the wires. If the wires are connected incorrectly, the control board will be damaged.

NEVER insert the battery with the terminals to the right.

RED wire to POSITIVE (+) terminal

RED

BLACK

BLACK wire to NEGATIVE () terminal

HINT: A dab of household petroleum jelly on the battery terminals will help prevent corrosion.

Step 19

Insert the stripped power cable wires into the appropriate terminals on the FIRST OPERATOR terminal block. The green wire should be inserted into the GRN terminal, the blue wire into BLU, the orange wire into ORG, black wire into BLK, and the red wire into the RED terminal.

Tighten the set screws against the end of the wires. A dab of petroleum jelly on each terminal will help prevent corrosion.

Step 18

Strip approximately 3/16" of insulation from each wire of the power cable. Twist each exposed wire tightly (there are five [5] wires inside the power cable sheath). Remove lock nut from strain relief hub. Insert strain relief hub and sealing nut (along with power cable) into hole on bottom of control box. Thread approximately 4" of the power cable into the control box and retighten lock nut and sealing nut until the power cable locks into place.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

AU

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLOSE

 

 

 

+

 

 

 

 

 

 

 

 

 

 

 

INERTIA

12 V Battery

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SENS.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OBSTR.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LEARN

 

1~8VAC~ SO– LA+R

RED

BLK

ORG

BLU

GRN

EDGCLS

EDGOPN

RED BLK ORG BLU GRN EDGCLS EDGOPN

GRN

ORG

BLU

WHT

R

G B

 

ALARM

ACCESSORY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RCVR

 

 

 

 

 

 

 

 

 

SECOND OPERATOR

 

 

 

 

 

 

 

POWER IN

FIRST OPERATOR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Strain Relief

Relief

Lock Nut

 

Strain

 

 

Hub

 

 

Operator Power Cable

 

Sealing Nut

 

 

18VAC SOLAR ~ ~ – +

POWER IN

 

 

 

 

 

 

 

 

 

SEQ1

 

 

 

OPN EDG

 

 

CLS EDG OPN EDG

 

￿￿SEQ2

RED

BLK ORG BLU GRN

CLS EDG

RED

BLK ORG BLU GRN

GRN

ORG

BLU WHT

FIRST OPERATOR

 

SECOND OPERATOR

ALARM ACCESSORY

LEARN

R

B

G

 

RCVR

Correct

Terminal Wire Block

Wrong

Terminal Wire Block

Wrong

Terminal Wire Block

Power Cable

from First Operator

Step 20: Verify that the control box power switch is OFF before proceeding to the next step!

18

Image 21
Contents Series Converting Temperature Table of Contents Disconnecting the Operator Important Safety InstructionsII. During Installation Before InstallationIII. After Installation Secondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ANo ONE should Cross the Path of the Moving Gate Consumer/End UserRequired Safety Precautions for Swing Gates Install Warning SignsEntrapment Protection Moving Gate Can Cause Injury Or Death GTO/PRO 2000 Series Swing Gate Operators Technical SpecificationsHardware not to scale PartsControl Box and Electrical Components Single Gate Operator Parts ListPreparing the Gate Pull-to-Open Single Gate gate opens into the propertyStep Installing The Post Bracket Assembly Step 1/ nut. Note when tightening Connecting Operator to Post Bracket AssemblyRear mount bolt, leave it loose Enough for the operator to pivotInstalling the Gate Bracket Installing the Open and Closed Position Stops Mounting the Control Box Battery Never insert the battery with the terminals to the rightGate Length Powering the SystemSplice wires together Solar Zones and Gate ActivityEstimated Maximum Number of Cycles Per Day Not touch each other Make sure the exposed wires do not touch each otherDIP Switches Control Board SettingsPotentiometers Setting the Personal Transmitter Code Set the transmitter DIP SwitchesRemove the Transmitter Cover Mounting the Receiver MemoryRun the cable through PVC conduit to protect it from damage Setting the Closed Position Limit Switch Step For Pull-to-Open InstallationsFor Push-to-Open Installations Step Connecting Additional Safety Devices Compatible Safety Devices Safety EdgesPhotoelectric Beams WHT white used with GRN green Connecting AccessoriesBLU blue used with GRN green ORG orange used with GRN greenPush-to-Open Installation Step PTO-1Step PTO-2 Step PTO-4 Step PTO-3Step PTO-5 Step PTO-6Maintenance Maintenance and Troubleshooting GuidePage Warranty and Repair Service Limited Two Year WarrantyGTO, Inc., 3121 Hartsfield Road, Tallahassee, Florida, USA Column Installation Information GTO/PRO 2200 Dual Gate System Second Unit Parts ListGTO Automatic Gate Lock see Accessory Catalog Installing The Second UnitStep D1 StepD2StepD3 Connecting the Second Operator to the Control BoardStep D-4 Step D-5Step D-7 Setting the Control Board for Dual Gate InstallationsStep D-8 Step D-9Step D-11 Accessories Available Through Your Dealer RB101GTO Nema Box FM317 433IH ACCESS-oriesRB509 Master Pin Lock RB975Replacement Batteries Access -oriesInstallation of this operator conforms to Class Installation Check list