Specifications and Dimensions
Mounting Bolt Installation
Requirements
Approved Foundations Only
NOTE: If installing expansion bolts into an elevated concrete foundation pad, the concrete foundation pad should extend a minimum of 9 inches (229 mm) for 35 machines or 12 inches (305
mm)for 60 - 150 machines out from the machine base on all sides. Refer to Figure 9.
A bolt kit consisting of eight bolts is available as an option. 35 machines use
60 – 125 machines use
On 35 – 125 machines, the threaded end of the bolts should extend 2 inches (5.08 cm) above the mounting surface. On 150 machines, the threaded end of the bolts should extend 3 inches above the mounting surface.
Refer to Figure 10 for a typical installation of individual mounting bolts.
1
0.75 in.2
(19 mm)
2 in. | 3 |
(51 mm) |
|
8 in. | 4 |
(203 mm)
For new foundations a
1
2
3
4 |
PHM179N
1Machine Frame Base
2Mounting Bolt Threads
3Grouting
4Reinforcing Rod
Figure 11
PHM722N
1Machine Frame Base
2Mounting Bolt Threads
3Grouting
4Cement or Structural Epoxy
Figure 10
30 | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | F8138601 |