10) Remove the bushing.
11) Measure the mark on the motors' shaft (from Step #8) to the end of the shaft and mark the new motors' shaft.
12) Install new blower on to the motor base.
13) Slide the motor pulley on to the new blower motors' shaft.
14) Slide the bushing onto the shaft until the inside of the bushing meets the mark (from Step #11) on the new motors' shaft.
PULLEY INSTALLATION
15) Tighten/secure the set screws into the bushing.
16) Insert the bolts into the large holes on the bushing and thread them into
the motor pulley.
17) Tighten the bolts evenly for motor pulley installation.
MAN3286
18) Align the pulleys.
19) Tighten (hand tight only) the bolts for the new motor to the motor base. Leave enough movement for V-belt adjustment.
20) Replace the V-belts...
a) Adjust to proper tension by adjusting the position of the new blower motor. b) Align the V-belts.
21) Tighten/secure the new motor to the motor base.
22) Reconnect the wires onto the new motor that were marked and disconnected in Step #3. A wiring diagram is usually affixed to the side of the motor.
23) Reinstall the belt guard removed in Step #2.
24) Reestablish electrical service to the dryer.
25
5) Remove the bolts from the bushing.
6) Insert the bolts into the threaded holes.
7) Tighten the bolts evenly for motor pulley removal.
8) Mark the inside of the motors' shaft before removing the bushing.
9) Loosen the set screws in the bushing.
PULLEY REMOVAL
MAN3286