ADC AD-464 service manual Pulley Removal

Page 29
10) Remove the bushing.
11) Measure the mark on the motors' shaft (from Step #8) to the end of the shaft and mark the new motors' shaft.
12) Install new blower on to the motor base.
13) Slide the motor pulley on to the new blower motors' shaft.
14) Slide the bushing onto the shaft until the inside of the bushing meets the mark (from Step #11) on the new motors' shaft.
PULLEY INSTALLATION
15) Tighten/secure the set screws into the bushing.
16) Insert the bolts into the large holes on the bushing and thread them into
the motor pulley.
17) Tighten the bolts evenly for motor pulley installation.
MAN3286
18) Align the pulleys.
19) Tighten (hand tight only) the bolts for the new motor to the motor base. Leave enough movement for V-belt adjustment.
20) Replace the V-belts...
a) Adjust to proper tension by adjusting the position of the new blower motor. b) Align the V-belts.
21) Tighten/secure the new motor to the motor base.
22) Reconnect the wires onto the new motor that were marked and disconnected in Step #3. A wiring diagram is usually affixed to the side of the motor.
23) Reinstall the belt guard removed in Step #2.
24) Reestablish electrical service to the dryer.
25
5) Remove the bolts from the bushing.
6) Insert the bolts into the threaded holes.
7) Tighten the bolts evenly for motor pulley removal.
8) Mark the inside of the motors' shaft before removing the bushing.
9) Loosen the set screws in the bushing.

PULLEY REMOVAL

MAN3286

Image 29
Contents American Dryer Corporation Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section AIR JET System Section Pendant AssemblySection Sprinkler System Explosion could Result Safety PrecautionsNational Electric Code ANSI/NFPA no -LATEST Edition StandardsLiquids Routine MaintenanceCleaning Monthly Lubrication Days After Installation and Every 6 Months Thereafter AdjustmentsGAS Models ADG-464 SpecificationsSteam Models ADS-464 ADG-464 GAS Electrical Service SpecificationsEnclosure / AIR Supply / Exhaust Requirements Installation RequirementsElectrical Requirements and GAS Requirements Operational Service Check ProcedureTumbler Support and Drive System Component DESCRIPTION/REPLACEMENTPage Main AIR BLOWER/HEAT Reclaimer System +Z=X Compressed AIR System Filter element can be cleaned with soap and waterPage Page Page Safety Devices Safety Devices Locations/Functions/Messages Blower Squirrel Cage Fan Motor Assembly Pulley Removal Page Important do not Overtighten V-BELTS FreelyImportant do not Overtighten V-BELTS Blower Squirrel Cage Fan Electrical Components Page Tumbler Basket System Page Page Important do not Overtighten Turnbuckle Important do not Overtighten Turnbuckle Result in Damage to the Dryer and will Void the Warranty Important do not Overtighten Bolts Page Current Limiting Device is Required Rotational Sensor AssemblyPage TOP of Tumbler Basket Temperature Door Assembly Tumbler Basket Electrical Components Page PLC Programmable Logic Controller Description PLC Programmable Logic Controller SystemPage Page 111 PLC Programmable Logic Controller Component Replacement Page Page RTD Page Switch #1 Recycling Mode Page Page Page Combustion Air Damper Page Page Page Burner Air Switch Page Page Page Page Page Page Heat Reclaimer Settings Page Page Important Allow a full 72 hours for the silicone to cure Page Page Page Page Base Section Lint DRAWER/LINT Chamber SwitchesPage Page Resistive Temperature Device RTD RTD Resistive Temperature Device Locations Sprinkler System Description Sprinkler SystemPage MAN3190 Page AIR JET System AIR JET SystemPneumatic Valve Stack Valve AssemblyImportant Take Notice ... small components Page MAN4223 Internal Pilot and External Pilot Air Supply Pendant Assembly Description Pendant AssemblyADC450186 05/27/99-25 01/14/00-15