5)Remove the two (2) left hand jam nuts and the washers.
6)Remove the blower (squirrel cage fan) along with the 3/8" x 3/8" x 3" key from the blower shaft.
NOTE: Install the 3/8" x 3/8" x 3" key on to the blower shaft before installing the blower (squirrel cage fan).
7)To install new blower (squirrel cage) fan, reverse Step #7 thru Step #1.
1)Discontinue electrical service to the dryer.
2)Remove the belt guard.
3)Loosen the bolts securing the blower motor to the motor base; a. Ease off on the tension bolt.
4)Slide the blower motor forward.
5)Remove and replace
NOTE: For proper belt replacement, the
6) Tighten/secure the tension bolt.
IMPORTANT: DO NOT OVERTIGHTEN V-BELTS.
7)Using a straight edge, make certain that the motor pulley and the
8)Secure/tighten the bolts from the motor to the motor base.
9)Reinstall the belt guard removed in Step #2.
10)Reestablish electrical service to the dryer.
e.Blower Shaft Replacement
The procedure to replace the blower shaft is the same procedure used to replace the shrouded pillow block bearing. (Refer to page 26 and page 27.)