ADC AD-464 service manual

Page 37

16)Remove the taper lock bushing.

17)Remove the drive wheel.

13) Tighten the bolts evenly for wheel removal.

18)To install new drive wheel, reverse Step #17 thru Step #3.

19)Reconnect air supply disconnected in Step #2.

20)Reestablish electrical power to the dryer. b. 5 HP Drive Motor Replacement

1)Discontinue electrical service to the dryer.

2)Mark and identify the wires that will be removed for proper reinstallation.

3)Loosen the turnbuckle and remove the V-belts.

4)Remove the bolts securing the drive motor to the motor mount.

5)Remove the drive motor from the dryer.

6)Mark the inside of the drive shaft before removing the wheel taper lock bushing (for proper re- installation)

7)Remove the taper lock bushing and motor pulley.

a)Remove the bolts securing the taper bushing.

b)Insert the bolts into the threaded holes and tighten the bolts evenly for pulley removal.

c)Loosen the set screws on the taper lock bushing and remove the bushing.

8)Measure the mark on the drive motor shaft to the end of the shaft.

9)Mark the shaft of the new drive motor to the measurements from the old motor.

NOTE: For proper belt replacement, the V-belts should be replaced in matched sets (both belts).

10)Align the taper lock bushing with the mark on the shaft of the new drive motor and install by tightening the set screw.

11)Insert bolts into the holes of the taper lock bushing and thread into the motor pulley, then tighten evenly.

12)Install new drive motor and hand tighten the bolts that secure the drive motor to the motor mount.

13)Reinstall the V-belts removed in Step #3.

33

Image 37
Contents American Dryer Corporation Important Note to Purchaser Retain This Manual In a Safe Place For Future ReferenceFor Your Safety Page Table of Contents Section Sprinkler System Section Pendant AssemblySection AIR JET System Explosion could Result Safety PrecautionsNational Electric Code ANSI/NFPA no -LATEST Edition StandardsCleaning Routine MaintenanceLiquids Monthly Lubrication Days After Installation and Every 6 Months Thereafter AdjustmentsGAS Models ADG-464 SpecificationsSteam Models ADS-464 ADG-464 GAS Electrical Service SpecificationsEnclosure / AIR Supply / Exhaust Requirements Installation RequirementsElectrical Requirements and GAS Requirements Operational Service Check ProcedureTumbler Support and Drive System Component DESCRIPTION/REPLACEMENTPage Main AIR BLOWER/HEAT Reclaimer System +Z=X Compressed AIR System Filter element can be cleaned with soap and waterPage Page Page Safety Devices Safety Devices Locations/Functions/Messages Blower Squirrel Cage Fan Motor Assembly Pulley Removal Page Important do not Overtighten V-BELTS FreelyImportant do not Overtighten V-BELTS Blower Squirrel Cage Fan Electrical Components Page Tumbler Basket System Page Page Important do not Overtighten Turnbuckle Important do not Overtighten Turnbuckle Result in Damage to the Dryer and will Void the Warranty Important do not Overtighten Bolts Page Current Limiting Device is Required Rotational Sensor AssemblyPage TOP of Tumbler Basket Temperature Door Assembly Tumbler Basket Electrical Components Page PLC Programmable Logic Controller Description PLC Programmable Logic Controller SystemPage Page 111 PLC Programmable Logic Controller Component Replacement Page Page RTD Page Switch #1 Recycling Mode Page Page Page Combustion Air Damper Page Page Page Burner Air Switch Page Page Page Page Page Page Heat Reclaimer Settings Page Page Important Allow a full 72 hours for the silicone to cure Page Page Page Page Base Section Lint DRAWER/LINT Chamber SwitchesPage Page Resistive Temperature Device RTD RTD Resistive Temperature Device Locations Sprinkler System Description Sprinkler SystemPage MAN3190 Page AIR JET System AIR JET SystemPneumatic Valve Stack Valve AssemblyImportant Take Notice ... small components Page MAN4223 Internal Pilot and External Pilot Air Supply Pendant Assembly Description Pendant AssemblyADC450186 05/27/99-25 01/14/00-15