ADC AD-464 Important do not Overtighten Turnbuckle, Important do not Overtighten V-BELTS

Page 38

14Check that the motor pulley is properly aligned.

15) Secure the drive motor to the motor mount.

16) Tighten the turnbuckle.

IMPORTANT: DO NOT OVERTIGHTEN TURNBUCKLE.

17)Rewire the new drive motor in the same sequence as the wiring that was removed in Step #2. A wiring diagram is usually affixed to the side of the motor.

18)Reestablish electrical service to the dryer. c. V-Belt Replacement

1)Discontinue electrical service to the dryer.

2)Loosen the turnbuckle a tighten the V-belts.

3)Install the new V-belts.

NOTE: For proper belt replacement, the V-belts should be replaced in matched sets (both belts).

4) Tighten the turnbuckle.

IMPORTANT: DO NOT OVERTIGHTEN V-BELTS.

5)Reestablish electrical service to the dryer.

d. Taper Lock Bushing and Drive Motor Pulley Replacement

1)Discontinue electrical service to the dryer.

2)Loosen the turnbuckle remove the V-belts.

3)Mark the inside of the drive motor shaft.

4)Remove the bolts securing the taper lock busing.

5)Insert bolts into the threaded holes on the motor pulley and tighten evenly for pulley removal.

6)Loosen the set screws on the taper lock bushing and remove the bushing.

7)Measure the mark on the motor drive shaft to the end of the shaft.

8)Install the new drive motor pulley.

9)Align the new taper lock bushing with marks on the shaft and install by tightening the set screws

34

Image 38
Contents American Dryer Corporation Retain This Manual In a Safe Place For Future Reference Important Note to PurchaserFor Your Safety Page Table of Contents Section AIR JET System Section Pendant AssemblySection Sprinkler System Safety Precautions Explosion could ResultStandards National Electric Code ANSI/NFPA no -LATEST EditionLiquids Routine MaintenanceCleaning Monthly Lubrication Adjustments Days After Installation and Every 6 Months ThereafterSpecifications GAS Models ADG-464Steam Models ADS-464 Electrical Service Specifications ADG-464 GASInstallation Requirements Enclosure / AIR Supply / Exhaust RequirementsOperational Service Check Procedure Electrical Requirements and GAS RequirementsComponent DESCRIPTION/REPLACEMENT Tumbler Support and Drive SystemPage Main AIR BLOWER/HEAT Reclaimer System +Z=X Filter element can be cleaned with soap and water Compressed AIR SystemPage Page Page Safety Devices Safety Devices Locations/Functions/Messages Blower Squirrel Cage Fan Motor Assembly Pulley Removal Page Freely Important do not Overtighten V-BELTSImportant do not Overtighten V-BELTS Blower Squirrel Cage Fan Electrical Components Page Tumbler Basket System Page Page Important do not Overtighten Turnbuckle Important do not Overtighten Turnbuckle Result in Damage to the Dryer and will Void the Warranty Important do not Overtighten Bolts Page Rotational Sensor Assembly Current Limiting Device is RequiredPage TOP of Tumbler Basket Temperature Door Assembly Tumbler Basket Electrical Components Page PLC Programmable Logic Controller System PLC Programmable Logic Controller DescriptionPage Page 111 PLC Programmable Logic Controller Component Replacement Page Page RTD Page Switch #1 Recycling Mode Page Page Page Combustion Air Damper Page Page Page Burner Air Switch Page Page Page Page Page Page Heat Reclaimer Settings Page Page Important Allow a full 72 hours for the silicone to cure Page Page Page Page Lint DRAWER/LINT Chamber Switches Base SectionPage Page Resistive Temperature Device RTD RTD Resistive Temperature Device Locations Sprinkler System Sprinkler System DescriptionPage MAN3190 Page AIR JET System AIR JET SystemStack Valve Assembly Pneumatic ValveImportant Take Notice ... small components Page MAN4223 Internal Pilot and External Pilot Air Supply Pendant Assembly Pendant Assembly DescriptionADC450186 05/27/99-25 01/14/00-15