Lincoln Electric SVM 113-A service manual Output Choke Removal and Replacement

Page 89

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-51

F-51

TROUBLESHOOTING & REPAIR

OUTPUT CHOKE REMOVAL AND REPLACEMENT (continued)

FIGURE F.21 - OUTPUT CHOKE MOUNTING DETAILS

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

PROCEDURE

1.Remove the engine spark plug wire to pre- vent accidental kickback or starting.

2.With the 5/16" nut driver, remove the 8 sheet metal screws from the case top.

3.With the 5/16" nut driver and 5/16" wrench, remove the 6 sheet metal screws that hold the control panel in place. Carefully move the control panel aside as far as the leads will allow.

4.Remove the output rectifier bridge. Refer to "THE OUTPUT RECTIFIER BRIDGE REMOVAL AND REPLACEMENT" proce- dure in this section of the manual.

5.With the 9/16" wrench, remove the heavy choke lead from the positive output termi- nal.

6.With the 1/2" wrench, remove the four mounting screws that hold the output choke in place.

NOTE: The two thread forming screws (with shake-proof lock washers) are used in the two holes nearest the engine.

7.With the 5/16" nut driver, remove the one sheet metal screw that holds the choke assembly to the sheet metal.

8.Cut any necessary cable ties with the diagonal cutters.

9.Unfasten any necessary cable restraints.

10.With the 5/16" nut driver, remove the sheet metal grounding screw and the two green ground wires.

11.Remove the two leads #208 and #209 from the idler solenoid.

12.Remove lead #14 from lead #14A by pulling apart the quick connect splice.

13.Carefully remove the choke assembly by lifting up and out.

NOTE: The idler solenoid will be removed with the choke assembly. Take care to slide the plunger out from the solenoid housing.

WELDANPOWER 125

Image 89
Contents Weldanpowertm California Proposition 65 Warnings SafetyElectric Shock can kill Cylinder may explode if damaged Précautions DE Sûreté Master Table of Contents for ALL Sections Table of Contents Installation Section Technical Specifications Weldanpower InstallationStoring Safety PrecautionsLocation and Ventilation PRE-OPERATION Engine Service Welding Cable Connections Electrical Output ConnectionsPlugs and HAND-HELD Equipment Auxiliary Power ReceptaclesMachine Grounding Circuit Breakers Premises WiringThese Devices Without Table of Contents Operation Section Operation Safety InstructionsOperating Instructions General DescriptionDesign Features Advantages Operational Features and ControlsRecommended Applications Welding CapabilityWELDER/GENERATOR Controls Controls and SettingsFigure B.2 Gasoline Engine Controls Gasoline Engine ControlsStarting the Engine Engine OperationBefore Starting the Engine For Best Engine Starting Stopping the EngineBREAK-IN Period Welding OperationGeneral Information LOW OIL SensingTIG Welding To USE the Weldanpower 125 for WELD- INGTable B.2 Electrode Selection Guide To USE the Weldanpower 125 AS AN Auxiliary Power Supply Auxiliary PowerTable B.3 Generator Power Applications Table of Contents Accessories Briggs and Stratton Accessories OPTIONS/ACCESSORIESLincoln Electric Accessories Table of Contents Maintenance Engine Maintenance Routine and Periodic MaintenanceMaintanence Figure D.3 Clean Finger GuardFigure D.5 SET Spark Plug GAP Table D.2 Engine Maintenance Parts WELDER/GENERATOR MaintenanceFigure D.6 Major Component Locations Table of Contents Theory of Operation Section Idler Board ENGINE, EXCITATION, Rotor and StatorAuxiliary Power Overcurrent Protection Rotor Field Feedback Auxiliary Power Engine Idle ControlFigure E.4 Weld WINDING, Output Rectifier and Choke Weld WINDING, Output Rectifier and ChokeTable of Contents Trouble Shooting & Repair Section HOW to USE Troubleshooting Guide Troubleshooting & RepairElectric Shock can kill PC Board Troubleshooting ProceduresOutput Problems Troubleshooting GuideOutput Rectifier Troubleshooting & Repair Perform the Engine Throttle Engine Problems Main Stator Winding Test Engine Throttle Adjustment Troubleshooting & Repair Weldanpower Materials Needed Rotor Voltage TestTest Description Rotor Voltage Test Test ProcedureRotor Resistance Test Rotor Resistance Test Figure F.3 Brushes Retained with Cable TIE Output Rectifier Bridge Test Output Rectifier Bridge Test Main Stator Test Main Stator Test Figure F.6 Main Stator Molex Plug Test Points Rotor Flashing Circuit Test Rotor Flashing Circuit Test WP125 Idler Engine Throttle Adjustment Test Test Procedure Figure F.12 Idle Speed Adjustment Screw Locations Figure F.13 LOW Idle Adjustment NUT on Idler Solenoid TOC High Idle no Load Output Control AT Maximum Scope SettingsNormal Open Circuit Weld Voltage Waveform Normal Open Circuit Voltage Waveform 115 VAC Supply Machine Loaded to 125 Amps AT 25 VAC Typical Weld Output WaveformMachine Loaded Abnormal Open Circuit Weld Voltage Waveform Description Brush Removal and ReplacementFigure F.14 Brushes Retained with Cable TIE ProcedureProcedure Rheostat Removal and Replacement Rheostat Removal and Replacement Field Capacitor Removal and Replacement Field Capacitor Removal and Replacement Field Diode Bridge Removal and Replacement Field Diode Bridge Removal and Replacement Figure F.18 Field Diode Bridge Location Idler Printed Circuit Board Removal Replacement Carefully remove the board Output Rectifier Bridge Removal Replacement Output Rectifier Bridge Removal and Replacement Troubleshooting & Repair Output Choke Removal and Replacement Output Choke Removal and Replacement Section TOC Instructions STATOR/ROTOR Removal and ReplacementStator Removal Procedure Troubleshooting & Repair Reassembly Procedure Rotor Removal ProcedureFigure F.24 Checking ROTOR-STATOR AIR GAP Feeler Gauge Troubleshooting & Repair Retest After Repair Auxiliary Power Receptacle OUTPUT1Engine Output WELDER/GENERATOR OUTPUT1Weldanpower Table of Contents Diagrams Section Wiring Diagram Code 10158 Idler PC Board M17578 DiagramsSchematic Dimension Print Weldanpower Weldanpower M17578-1 M17578 Idler PC BoardDescription M17578 Idler PC Board Bill of MaterialsWeldanpower