Cisco Systems 2130, 2140 Preparing Your Site for Installation, Lifting Guidelines, Site Planning

Page 38

Chapter 2 Preparing to Install the Cisco ADE 2130 and 2140 Series Appliance

Preparing Your Site for Installation

Lifting Guidelines

A Cisco ADE 2130 or 2140 Series appliance weighs between 30 lb (13.6 kg) and 51.5 lb (23.4 kg) depending on what hardware options are installed in the appliance. The appliance is not intended to be moved frequently. Before you install the appliance, ensure that your site is properly prepared so you can avoid having to move the appliance later to accommodate power sources and network connections.

Whenever you lift the appliance or any heavy object, follow these guidelines:

Always disconnect all external cables before lifting or moving the appliance.

Ensure that your footing is solid, and balance the weight of the object between your feet.

Lift the appliance slowly; never move suddenly or twist your body as you lift.

Keep your back straight and lift with your legs, not your back. If you must bend down to lift the appliance, bend at the knees, not at the waist, to reduce the strain on your lower back muscles.

Lift the appliance from the bottom and grasp the underside of the appliance exterior with both hands.

Preparing Your Site for Installation

Before installing the Cisco ADE 2130 and 2140 Series appliance, it is important to prepare for installation by:

Preparing the site (site planning) and reviewing the installation plans or method of procedures (MOPs)

Unpacking and inspecting the appliance

Gathering tools and test equipment required to properly install the appliance

Site Planning

Warning This unit is intended for installation in restricted access areas. A restricted access area can be accessed only through the use of a special tool, lock and key, or other means of security. Statement 1017

Typically, you should have prepared the installation site beforehand. As part of your preparation, obtain a floor plan of the site and the equipment rack where the Cisco ADE 2130 and 2140 Series appliance will be housed. Determine the location of any existing appliances and their interconnections, including communications and power. Following the airflow guidelines (see the “Airflow Guidelines” section on page 2-9) ensures that adequate cooling air is provided to the appliance.

All personnel involved in the installation of the appliance including installers, engineers, and supervisors should participate in the preparation of a MOP for approval by the customer. (See the “Method of Procedure” section on page 2-11.)

The following sections provide the site requirement guidelines that you must consider before installing the appliance:

Rack Installation Safety Guidelines, page 2-7

Site Environment, page 2-8

Airflow Guidelines, page 2-9

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

2-6

78-18579-02

 

 

Image 38
Contents Americas Headquarters Text Part NumberCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Audience Document Revision HistoryObjectives OrganizationConventions Chapter Title DescriptionSafety Warnings Bewaar Deze InstructiesAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Obtaining Documentation and Submitting a Service Request Related DocumentationXvi A P T E R Product Overview ModelProduct Serial Number Location Cisco ADE 2130 Series Appliance Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco Product Identification Tool GB Sdram CADE-RAM-25EF= Specification Description Cisco Spare Part NumberCisco ADE 2140 Series Appliance CADE-2U-AC-PSU=Hardware Features Cisco ADE 2130 and 2140 Series Appliance Front ViewFront Control Panel LEDs and Switches Color State DescriptionSwitch Cisco ADE 2130 and 2140 Series Appliance Rear ViewNIC LEDs Used usedAC and DC Power Supply LEDs Input/Output Ports and Connectors Ethernet Port NIC 1 and NICType Description Ethernet Port Pin Signal DescriptionSerial Console Port Signal Description RJ-45-to-DB-9 Terminal Adapter Console RTS CTS DTR DSR TXD RXD GNDAC and DC Power Supplies DC Power Supply InputRegulatory Compliance Overtemperature Protection OTPEnvironmental Monitoring Overcurrent Protection OCPA P T E R Safety Guidelines General PrecautionsSafety with Equipment Safety with ElectricityPage Preventing Electrostatic Discharge Damage Site Planning Preparing Your Site for InstallationLifting Guidelines Rack Installation Safety Guidelines Post Open RackSite Environment Temperature and Humidity Guidelines Airflow GuidelinesPower Considerations Specification Minimum MaximumMethod of Procedure DC Power Supply Safety ConsiderationsUnpacking and Checking the Contents of Your Shipment Cisco Information Packet and Warranty Cisco Part NumberTo Receive a Return Materials Authorization RMA Number Duration of Hardware WarrantyReplacement, Repair, or Refund Policy for Hardware Required Tools and EquipmentTask Verified by Date Installation ChecklistCreating a Site Log Serial Console Port Connections Ethernet and Console Port ConsiderationsNIC 1 and NIC 2 RJ-45 Ethernet Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance Post Rack-Mount Hardware Kit 2-Post Rack-Mount KitMid-Mounting in a 2-Post Rack Attaching the L Brackets to the ApplianceInstalling the Appliance in the Rack Attaching an L Bracket to a Center Post4-post Rails and Brackets Attaching the Inner Slide Rails to the Appliance Item No Description QuantityInstalling the Appliance into the Rack Attaching the Outer Slide Rails to the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Grounding the Rack Connecting the Appliance DC Power and GroundPower Connections Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network and Console Cables Connecting the Network InterfaceConnecting the Console Cable ManagementPowering Up the Cisco ADE 2130 and 2140 Series Appliance Power-Up Procedure AC Power SupplyPower-Up Procedure DC Power Supply Checking the LEDsADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Hardware Options Preparing for a Successful InstallationBefore You Begin Description Cisco Spare Part NumberRemoving the Cover Beginning the InstallationTools and Supplies Needed Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Installing a Hard Drive Tray into the Appliance Removing the Front BezelRemoving the Hard Drive Tray Removing and Installing the Processor Air Duct Removing the Processor Air DuctTo remove the processor air duct Installing and Removing Memory Installing the Processor Air DuctBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving and Installing the PCI Adapter Card Removing DIMMsConfiguration Bottom Slot Middle Slot Top Slot Configuration Lower Slot Upper SlotRemoving the PCI Riser Assembly PCI riser assembly PinsRemoving a PCI Adapter Card Removing a Full-Height Adapter CardInstalling a PCI Adapter Card Installing or Replacing a Power Supply Installing the PCI Riser AssemblyReplacing a Redundant Power Supply AC and DC Power Supply ModulesReplacing a Nonredundant Power Supply Adding a New Redundant Power SupplyCompleting the Installation Installing the Cover231198 Page Troubleshooting Troubleshooting OverviewProblem Solving Troubleshooting the Power and Cooling Systems Environmental Reporting FeaturesTroubleshooting Adapter Cards, Cables, and Connections Reading the LEDs Front-Panel LEDsNIC LEDs Figure A-2 NIC 1 and NIC 2 LEDsProduct Serial Number Location Cisco Product Identification ToolPage Site Log Date InitialsMaintaining the Cisco ADE 2130 Appliance Maintaining Your Site EnvironmentAppliance General Exterior Cleaning and InspectionCables and Connectors Adapter CardsTemperature CoolingElectrostatic Discharge HumidityAltitude Electromagnetic and Radio Frequency InterferencePower Source Interruptions MagnetismPage Numerics See ESD EMISee MOP NICPreventing effects RJ-45 pinout NIC Safety guidelines RFIIN-5 IN-6