Chapter 2 Preparing to Install the Cisco ADE 2130 and 2140 Series Appliance
Preparing Your Site for Installation
–Autoselects either
–All appliances include an electrical cord. (A label near the power cord indicates the correct voltage, frequency, current draw, and power dissipation for the appliance.)
Warning This product relies on the building’s installation for
•Install proper grounding to your appliance and host equipment rack to avoid damage from lightning and power surges.
Warning This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available. Statement 1024
•The
DC Power Supply Safety Considerations
Follow these precautions and recommendations when planning power connections to your appliance:
•Check the power at your site before installation and periodically after installation to ensure that you are receiving clean power (free of spikes and noise). Install a power conditioner if necessary.
•The DC power supply includes the following features:
–
Warning This product relies on the building’s installation for
•Install proper grounding to your appliance and host equipment rack to avoid damage from lightning and power surges.
Warning This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available. Statement 1024
Method of Procedure
As described previously, part of your preparation includes reviewing installation plans or MOPs. An example of a MOP (a preinstallation checklist of tasks and considerations that need to be addressed and agreed upon before proceeding with the installation) is as follows:
1.Assign personnel.
2.Determine protection requirements for personnel, equipment, and tools.
3.Evaluate potential hazards that may affect service.
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
|
| ||
|
|