Chapter 4 Installing the Cisco ADE 2130 and 2140 Series Appliance Hardware Options
Tools and Supplies Needed
Table
Description | Cisco Spare Part Number |
|
|
Cisco ADE Accelerator Card – 10 Gb/s (requires | |
| |
memory) |
|
|
|
Cisco ADE XFP – long reach | |
|
|
Cisco ADE XFP – short reach | |
|
|
Cisco ADE – |
|
|
|
1.Serial ATA = Serial Advanced Technology Attachment.
2.SAS = Serial Attached SCSI (Small Computer System Interface).
Tools and Supplies Needed
You need the following tools and equipment to install, replace, and remove the hardware options:
•Number 1 and 2 Phillips screwdrivers
•ESD or antistatic wrist strap and conductive foam pad or mat (recommended)
Beginning the Installation
To begin the installation, you must remove the front bezel and appliance top cover. Before removing the cover, power down the appliance, and unplug all external cables and the AC power cable or DC power wires.
Removing the Cover
Warning Before performing any of the following procedures, ensure that power is removed from the DC circuit. Statement 1003
Warning Before working on a chassis or working near power supplies, unplug the power cord on AC units. Statement 246
Note A nonskid surface or a stop behind the appliance may be needed to prevent the appliance from sliding on your work surface.
To remove the cover:
Step 1 Review the information in the “Safety Warnings” section on page x and the “Safety Guidelines” section on page
Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide
|
|
| |
|
|