Cisco Systems manual Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Page 70

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Warning Do not touch the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power cord is connected. For systems without a power switch, line voltages are present within the power supply when the power cord is connected. Statement 4

Warning This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use. Statement 39

This section explains how to power up the appliance. Depending on whether your appliance has AC or DC power supplies, see the appropriate section:

Power-Up Procedure (AC Power Supply), page 3-20

Power-Up Procedure (DC Power Supply), page 3-21

Warning Never install an AC power module and a DC power module in the same chassis. Statement 1050

Power-Up Procedure (AC Power Supply)

To power up a Cisco ADE 2130 and 2140 Series appliance with an AC power supply and verify its initialization and self-test, follow this procedure. When the procedure is finished, the appliance is ready to configure.

Step 1 Review the information in the “Safety Guidelines” section on page 2-2.

Step 2 Before proceeding, if the AC power cord is connected directly into the AC power outlet and because the AC power cord provides its own ground conductor, you only need to ensure that the rack has been properly grounded. (See the “Connecting the Appliance AC Power” section on page 3-12for more information.)

Step 3 Plug the AC power cord into the power cord receptacle at the rear of the appliance. (See location 1 in Figure 1-5 on page 1-9.)

Step 4 Connect the other end of the power cord to a power source at your installation site. Step 5 If there is a second AC power supply, repeat Steps 3 and 4 for the second power supply.

Step 6 Press the power button on the front of the appliance. (See location 9 in Figure 3-13 on page 3-21.)

The appliance should begin its powerup procedure.

Step 7 After the operating system boots up, observe the front-panel LEDs to verify that your system is operating

properly. (See Figure 3-13 on page 3-21and the “Checking the LEDs” section on page 3-21.)

Once the operating system boots, you are ready to initialize the basic software configuration. (See the software installation guide or user guide that shipped with your appliance for proper configuration procedures.)

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

3-20

78-18579-02

 

 

Image 70
Contents Americas Headquarters Text Part NumberCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Audience Document Revision HistoryObjectives OrganizationConventions Chapter Title DescriptionSafety Warnings Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Obtaining Documentation and Submitting a Service Request Related DocumentationXvi A P T E R Product Overview ModelProduct Serial Number Location Cisco Product Identification Tool Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco ADE 2130 Series Appliance GB Sdram CADE-RAM-25EF= Specification Description Cisco Spare Part NumberCisco ADE 2140 Series Appliance CADE-2U-AC-PSU=Hardware Features Cisco ADE 2130 and 2140 Series Appliance Front ViewFront Control Panel LEDs and Switches Color State DescriptionSwitch Cisco ADE 2130 and 2140 Series Appliance Rear ViewNIC LEDs Used usedAC and DC Power Supply LEDs Input/Output Ports and Connectors Ethernet Port NIC 1 and NICSerial Console Port Ethernet Port Pin Signal DescriptionType Description Signal Description RJ-45-to-DB-9 Terminal Adapter Console RTS CTS DTR DSR TXD RXD GNDAC and DC Power Supplies DC Power Supply InputRegulatory Compliance Overtemperature Protection OTPEnvironmental Monitoring Overcurrent Protection OCPA P T E R Safety Guidelines General PrecautionsSafety with Equipment Safety with ElectricityPage Preventing Electrostatic Discharge Damage Lifting Guidelines Preparing Your Site for InstallationSite Planning Rack Installation Safety Guidelines Post Open RackSite Environment Temperature and Humidity Guidelines Airflow GuidelinesPower Considerations Specification Minimum MaximumMethod of Procedure DC Power Supply Safety ConsiderationsUnpacking and Checking the Contents of Your Shipment Cisco Information Packet and Warranty Cisco Part NumberTo Receive a Return Materials Authorization RMA Number Duration of Hardware WarrantyReplacement, Repair, or Refund Policy for Hardware Required Tools and EquipmentCreating a Site Log Installation ChecklistTask Verified by Date NIC 1 and NIC 2 RJ-45 Ethernet Connections Ethernet and Console Port ConsiderationsSerial Console Port Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance Post Rack-Mount Hardware Kit 2-Post Rack-Mount KitMid-Mounting in a 2-Post Rack Attaching the L Brackets to the ApplianceInstalling the Appliance in the Rack Attaching an L Bracket to a Center Post4-post Rails and Brackets Attaching the Inner Slide Rails to the Appliance Item No Description QuantityInstalling the Appliance into the Rack Attaching the Outer Slide Rails to the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Power Connections Connecting the Appliance DC Power and GroundGrounding the Rack Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network and Console Cables Connecting the Network InterfaceConnecting the Console Cable ManagementPowering Up the Cisco ADE 2130 and 2140 Series Appliance Power-Up Procedure AC Power SupplyPower-Up Procedure DC Power Supply Checking the LEDsADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Hardware Options Preparing for a Successful InstallationBefore You Begin Description Cisco Spare Part NumberTools and Supplies Needed Beginning the InstallationRemoving the Cover Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Installing a Hard Drive Tray into the Appliance Removing the Front BezelRemoving the Hard Drive Tray Removing and Installing the Processor Air Duct Removing the Processor Air DuctTo remove the processor air duct Installing and Removing Memory Installing the Processor Air DuctBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving and Installing the PCI Adapter Card Removing DIMMsConfiguration Bottom Slot Middle Slot Top Slot Configuration Lower Slot Upper SlotRemoving the PCI Riser Assembly PCI riser assembly PinsRemoving a PCI Adapter Card Removing a Full-Height Adapter CardInstalling a PCI Adapter Card Installing or Replacing a Power Supply Installing the PCI Riser AssemblyReplacing a Redundant Power Supply AC and DC Power Supply ModulesReplacing a Nonredundant Power Supply Adding a New Redundant Power SupplyCompleting the Installation Installing the Cover231198 Page Troubleshooting Troubleshooting OverviewProblem Solving Troubleshooting the Power and Cooling Systems Environmental Reporting FeaturesTroubleshooting Adapter Cards, Cables, and Connections Reading the LEDs Front-Panel LEDsNIC LEDs Figure A-2 NIC 1 and NIC 2 LEDsProduct Serial Number Location Cisco Product Identification ToolPage Site Log Date InitialsMaintaining the Cisco ADE 2130 Appliance Maintaining Your Site EnvironmentAppliance General Exterior Cleaning and InspectionCables and Connectors Adapter CardsTemperature CoolingElectrostatic Discharge HumidityAltitude Electromagnetic and Radio Frequency InterferencePower Source Interruptions MagnetismPage Numerics See ESD EMISee MOP NICPreventing effects RJ-45 pinout NIC Safety guidelines RFIIN-5 IN-6