Cisco Systems 2130, 2140 manual Post Rack-Mount Hardware Kit, Post Rack-Mount Kit

Page 54

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Mounting the Cisco ADE 2130 and 2140 Series Appliance in a 2-Post Rack

Caution To prevent injury, review the “Safety Guidelines” section on page 2-2and the “Rack-Mounting Configuration Guidelines” section on page 3-2before installing the appliance in the equipment rack.

Step 1 Locate the equipment rack position you plan to install the appliance into.

Step 2 Verify that there are no obstructions and ensure that the equipment rack is stabilized.

Step 3 Position the appliance in the equipment rack, lining up the bracket holes on the appliance with the holes on the rack, and secure it with two 10-32 x 1/2-inch rack screws (each side). You need two people to install the appliance in the rack—one person to hold the appliance and one person to secure it to the rack.

Note The vertical spacing for the equipment rack is at least 1.75 inches (4.44 cm), with mounting holes spaced 1.5 inches (3.81 cm) apart.

Step 4 Tighten the screws using a Number 2 Phillips screwdriver (each side).

2-Post Rack-Mount Hardware Kit

Figure 3-1shows the bracket and screws that you need to install the Cisco ADE 2130 and 2140 Series appliance in a 2-post rack. Table 3-1describes the contents of the rack-mount hardware kit, Cisco part number CADE-2U-BRACKETS.

Figure 3-1 2-Post Rack-Mount Kit

1

2

3

 

 

 

203369

 

Table 3-1

 

2-Post Rack-Mount Kit

 

Item No.

 

Description

Quantity

1

 

Rack screw, 10-32 x 1/2-inch (1.27 cm)

4

2

 

Screw, hex head

6

3

 

L bracket

2

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

3-4

78-18579-02

 

 

Image 54
Contents Americas Headquarters Text Part NumberCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Audience Document Revision HistoryObjectives OrganizationConventions Chapter Title DescriptionSafety Warnings Bewaar Deze InstructiesWarnung Wichtige Sicherheitshinweise Avvertenza Importanti Istruzioni Sulla SicurezzaAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Obtaining Documentation and Submitting a Service Request Related DocumentationXvi A P T E R Product Overview ModelProduct Serial Number Location Cisco ADE 2130 and 2140 Series Appliance Configurations Cisco Product Identification ToolCisco ADE 2130 Series Appliance GB Sdram CADE-RAM-25EF= Specification Description Cisco Spare Part NumberCisco ADE 2140 Series Appliance CADE-2U-AC-PSU=Hardware Features Cisco ADE 2130 and 2140 Series Appliance Front ViewFront Control Panel LEDs and Switches Color State DescriptionSwitch Cisco ADE 2130 and 2140 Series Appliance Rear ViewNIC LEDs Used usedAC and DC Power Supply LEDs Input/Output Ports and Connectors Ethernet Port NIC 1 and NICEthernet Port Pin Signal Description Serial Console PortType Description Signal Description RJ-45-to-DB-9 Terminal Adapter Console RTS CTS DTR DSR TXD RXD GNDAC and DC Power Supplies DC Power Supply InputRegulatory Compliance Overtemperature Protection OTPEnvironmental Monitoring Overcurrent Protection OCPA P T E R Safety Guidelines General PrecautionsSafety with Equipment Safety with ElectricityPage Preventing Electrostatic Discharge Damage Preparing Your Site for Installation Lifting GuidelinesSite Planning Rack Installation Safety Guidelines Post Open RackSite Environment Temperature and Humidity Guidelines Airflow GuidelinesPower Considerations Specification Minimum MaximumMethod of Procedure DC Power Supply Safety ConsiderationsUnpacking and Checking the Contents of Your Shipment Cisco Information Packet and Warranty Cisco Part NumberTo Receive a Return Materials Authorization RMA Number Duration of Hardware WarrantyReplacement, Repair, or Refund Policy for Hardware Required Tools and EquipmentInstallation Checklist Creating a Site LogTask Verified by Date Ethernet and Console Port Considerations NIC 1 and NIC 2 RJ-45 Ethernet ConnectionsSerial Console Port Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance Post Rack-Mount Hardware Kit 2-Post Rack-Mount KitMid-Mounting in a 2-Post Rack Attaching the L Brackets to the ApplianceInstalling the Appliance in the Rack Attaching an L Bracket to a Center Post4-post Rails and Brackets Attaching the Inner Slide Rails to the Appliance Item No Description QuantityInstalling the Appliance into the Rack Attaching the Outer Slide Rails to the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Connecting the Appliance DC Power and Ground Power ConnectionsGrounding the Rack Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network and Console Cables Connecting the Network InterfaceConnecting the Console Cable ManagementPowering Up the Cisco ADE 2130 and 2140 Series Appliance Power-Up Procedure AC Power SupplyPower-Up Procedure DC Power Supply Checking the LEDsADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Hardware Options Preparing for a Successful InstallationBefore You Begin Description Cisco Spare Part NumberBeginning the Installation Tools and Supplies NeededRemoving the Cover Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Installing a Hard Drive Tray into the Appliance Removing the Front BezelRemoving the Hard Drive Tray Removing and Installing the Processor Air Duct Removing the Processor Air DuctTo remove the processor air duct Installing and Removing Memory Installing the Processor Air DuctBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving and Installing the PCI Adapter Card Removing DIMMsConfiguration Bottom Slot Middle Slot Top Slot Configuration Lower Slot Upper SlotRemoving the PCI Riser Assembly PCI riser assembly PinsRemoving a PCI Adapter Card Removing a Full-Height Adapter CardInstalling a PCI Adapter Card Installing or Replacing a Power Supply Installing the PCI Riser AssemblyReplacing a Redundant Power Supply AC and DC Power Supply ModulesReplacing a Nonredundant Power Supply Adding a New Redundant Power SupplyCompleting the Installation Installing the Cover231198 Page Troubleshooting Troubleshooting OverviewProblem Solving Troubleshooting the Power and Cooling Systems Environmental Reporting FeaturesTroubleshooting Adapter Cards, Cables, and Connections Reading the LEDs Front-Panel LEDsNIC LEDs Figure A-2 NIC 1 and NIC 2 LEDsProduct Serial Number Location Cisco Product Identification ToolPage Site Log Date InitialsMaintaining the Cisco ADE 2130 Appliance Maintaining Your Site EnvironmentAppliance General Exterior Cleaning and InspectionCables and Connectors Adapter CardsTemperature CoolingElectrostatic Discharge HumidityAltitude Electromagnetic and Radio Frequency InterferencePower Source Interruptions MagnetismPage Numerics See ESD EMISee MOP NICPreventing effects RJ-45 pinout NIC Safety guidelines RFIIN-5 IN-6