Cisco Systems manual Cisco ADE 2130 and 2140 Series Appliance Power

Page 61

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Cisco ADE 2130 and 2140 Series Appliance Power

1

Rack screw (10-32 x 1/2 inch)

Proceed to the next section, “Cisco ADE 2130 and 2140 Series Appliance Power,” to continue the installation.

Cisco ADE 2130 and 2140 Series Appliance Power

The Cisco ADE 2130 and 2140 Series appliance has the capability of using either an AC power supply or a DC power supply.

Caution To ensure proper cooling if only one power supply is installed, the power supply must be in the right-hand slot and the power supply blank filler panel must be in the left-hand slot. (See Figure 4-10 on page 4-20.)

Caution If the DC power supply is used, ensure that the appliance is properly grounded.

Warning This equipment must be grounded. Never defeat the ground conductor or operate the equipment in the absence of a suitably installed ground conductor. Contact the appropriate electrical inspection authority or an electrician if you are uncertain that suitable grounding is available. Statement 1024

Warning This product relies on the building’s installation for short-circuit (overcurrent) protection. Ensure that the protective device is rated not greater than: 10 Amps Statement 1005

Warning Before working on a system that has an on/off switch, turn OFF the power and unplug the power cord. Statement 1

Warning Do not touch the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power cord is connected. For systems without a power switch, line voltages are present within the power supply when the power cord is connected. Statement 4

Warning Never install an AC power module and a DC power module in the same chassis. Statement 1050

Warning This unit might have more than one power supply connection. All connections must be removed to de-energize the unit. Statement 1028

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

 

78-18579-02

3-11

 

 

 

Image 61
Contents Text Part Number Americas HeadquartersCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Objectives Document Revision HistoryAudience OrganizationChapter Title Description ConventionsBewaar Deze Instructies Safety WarningsAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Related Documentation Obtaining Documentation and Submitting a Service RequestXvi A P T E R Model Product OverviewProduct Serial Number Location Cisco Product Identification Tool Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco ADE 2130 Series Appliance Cisco ADE 2140 Series Appliance Specification Description Cisco Spare Part NumberGB Sdram CADE-RAM-25EF= CADE-2U-AC-PSU=Cisco ADE 2130 and 2140 Series Appliance Front View Hardware FeaturesColor State Description Front Control Panel LEDs and SwitchesCisco ADE 2130 and 2140 Series Appliance Rear View SwitchUsed used NIC LEDsAC and DC Power Supply LEDs Ethernet Port NIC 1 and NIC Input/Output Ports and ConnectorsSerial Console Port Ethernet Port Pin Signal DescriptionType Description Signal Description RTS CTS DTR DSR TXD RXD GND RJ-45-to-DB-9 Terminal Adapter ConsoleDC Power Supply Input AC and DC Power SuppliesEnvironmental Monitoring Overtemperature Protection OTPRegulatory Compliance Overcurrent Protection OCPA P T E R General Precautions Safety GuidelinesSafety with Electricity Safety with EquipmentPage Preventing Electrostatic Discharge Damage Lifting Guidelines Preparing Your Site for InstallationSite Planning Post Open Rack Rack Installation Safety GuidelinesSite Environment Airflow Guidelines Temperature and Humidity GuidelinesSpecification Minimum Maximum Power ConsiderationsDC Power Supply Safety Considerations Method of ProcedureUnpacking and Checking the Contents of Your Shipment Cisco Part Number Cisco Information Packet and WarrantyReplacement, Repair, or Refund Policy for Hardware Duration of Hardware WarrantyTo Receive a Return Materials Authorization RMA Number Required Tools and EquipmentCreating a Site Log Installation ChecklistTask Verified by Date NIC 1 and NIC 2 RJ-45 Ethernet Connections Ethernet and Console Port ConsiderationsSerial Console Port Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance 2-Post Rack-Mount Kit Post Rack-Mount Hardware KitAttaching the L Brackets to the Appliance Mid-Mounting in a 2-Post RackAttaching an L Bracket to a Center Post Installing the Appliance in the Rack4-post Rails and Brackets Item No Description Quantity Attaching the Inner Slide Rails to the ApplianceAttaching the Outer Slide Rails to the Rack Installing the Appliance into the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Power Connections Connecting the Appliance DC Power and GroundGrounding the Rack Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network Interface Connecting the Network and Console CablesCable Management Connecting the ConsolePower-Up Procedure AC Power Supply Powering Up the Cisco ADE 2130 and 2140 Series ApplianceChecking the LEDs Power-Up Procedure DC Power SupplyADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Before You Begin Preparing for a Successful InstallationHardware Options Description Cisco Spare Part NumberTools and Supplies Needed Beginning the InstallationRemoving the Cover Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Removing the Front Bezel Installing a Hard Drive Tray into the ApplianceRemoving the Hard Drive Tray Removing the Processor Air Duct Removing and Installing the Processor Air DuctTo remove the processor air duct Installing the Processor Air Duct Installing and Removing MemoryBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving DIMMs Removing and Installing the PCI Adapter CardConfiguration Lower Slot Upper Slot Configuration Bottom Slot Middle Slot Top SlotPCI riser assembly Pins Removing the PCI Riser AssemblyRemoving a Full-Height Adapter Card Removing a PCI Adapter CardInstalling a PCI Adapter Card Installing the PCI Riser Assembly Installing or Replacing a Power SupplyAC and DC Power Supply Modules Replacing a Redundant Power SupplyAdding a New Redundant Power Supply Replacing a Nonredundant Power SupplyInstalling the Cover Completing the Installation231198 Page Troubleshooting Overview TroubleshootingProblem Solving Environmental Reporting Features Troubleshooting the Power and Cooling SystemsTroubleshooting Adapter Cards, Cables, and Connections Front-Panel LEDs Reading the LEDsFigure A-2 NIC 1 and NIC 2 LEDs NIC LEDsCisco Product Identification Tool Product Serial Number LocationPage Site Log Initials DateMaintaining Your Site Environment Maintaining the Cisco ADE 2130 ApplianceCables and Connectors General Exterior Cleaning and InspectionAppliance Adapter CardsCooling TemperatureAltitude HumidityElectrostatic Discharge Electromagnetic and Radio Frequency InterferenceMagnetism Power Source InterruptionsPage Numerics EMI See ESDNIC See MOPRFI Preventing effects RJ-45 pinout NIC Safety guidelinesIN-5 IN-6