Cisco Systems 2130 Installing the Appliance in the Rack, Attaching an L Bracket to a Center Post

Page 56

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Mounting the Cisco ADE 2130 and 2140 Series Appliance in a 2-Post Rack

Installing the Appliance in the Rack

Caution Lifting the appliance and attaching it to the rack is a two-person job. If needed, use an appropriate lifting device. A fully loaded Cisco ADE 2130 and 2140 Series appliance weighs approximately 51.5 lb (23.4 kg).

Before you begin, check the 10-32 x 1/2-inch screws that are included in the 2-post rack-mount kit (see Table 3-1 on page 3-4) to see if they are the correct size for your rack. If not, obtain the correct screws to use in the procedure where “rack screws” are required.

To mount the appliance in the rack:

Step 1 Locate one person at the front of the rack and one at the rear.

Step 2 Position an L bracket on the front side of the center post (see Figure 3-3).

Figure 3-3 Attaching an L Bracket to a Center Post

231949

Step 3 Attach the L bracket to the center post using the 10-32 x 1/2-inch rack screws (see Figure 3-3). Do not fully tighten the screws at this time.

Step 4 Repeat Steps 2 and 3 for the other L bracket.

Step 5 Tighten all the 10-32 x 1.2-inch rack screws on both sides of the rack.

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

3-6

78-18579-02

 

 

Image 56
Contents Americas Headquarters Text Part NumberCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Document Revision History ObjectivesAudience OrganizationConventions Chapter Title DescriptionSafety Warnings Bewaar Deze InstructiesAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Obtaining Documentation and Submitting a Service Request Related DocumentationXvi A P T E R Product Overview ModelProduct Serial Number Location Cisco ADE 2130 Series Appliance Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco Product Identification Tool Specification Description Cisco Spare Part Number Cisco ADE 2140 Series ApplianceGB Sdram CADE-RAM-25EF= CADE-2U-AC-PSU=Hardware Features Cisco ADE 2130 and 2140 Series Appliance Front ViewFront Control Panel LEDs and Switches Color State DescriptionSwitch Cisco ADE 2130 and 2140 Series Appliance Rear ViewNIC LEDs Used usedAC and DC Power Supply LEDs Input/Output Ports and Connectors Ethernet Port NIC 1 and NICType Description Ethernet Port Pin Signal DescriptionSerial Console Port Signal Description RJ-45-to-DB-9 Terminal Adapter Console RTS CTS DTR DSR TXD RXD GNDAC and DC Power Supplies DC Power Supply InputOvertemperature Protection OTP Environmental MonitoringRegulatory Compliance Overcurrent Protection OCPA P T E R Safety Guidelines General PrecautionsSafety with Equipment Safety with ElectricityPage Preventing Electrostatic Discharge Damage Site Planning Preparing Your Site for InstallationLifting Guidelines Rack Installation Safety Guidelines Post Open RackSite Environment Temperature and Humidity Guidelines Airflow GuidelinesPower Considerations Specification Minimum MaximumMethod of Procedure DC Power Supply Safety ConsiderationsUnpacking and Checking the Contents of Your Shipment Cisco Information Packet and Warranty Cisco Part NumberDuration of Hardware Warranty Replacement, Repair, or Refund Policy for HardwareTo Receive a Return Materials Authorization RMA Number Required Tools and EquipmentTask Verified by Date Installation ChecklistCreating a Site Log Serial Console Port Connections Ethernet and Console Port ConsiderationsNIC 1 and NIC 2 RJ-45 Ethernet Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance Post Rack-Mount Hardware Kit 2-Post Rack-Mount KitMid-Mounting in a 2-Post Rack Attaching the L Brackets to the ApplianceInstalling the Appliance in the Rack Attaching an L Bracket to a Center Post4-post Rails and Brackets Attaching the Inner Slide Rails to the Appliance Item No Description QuantityInstalling the Appliance into the Rack Attaching the Outer Slide Rails to the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Grounding the Rack Connecting the Appliance DC Power and GroundPower Connections Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network and Console Cables Connecting the Network InterfaceConnecting the Console Cable ManagementPowering Up the Cisco ADE 2130 and 2140 Series Appliance Power-Up Procedure AC Power SupplyPower-Up Procedure DC Power Supply Checking the LEDsADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Preparing for a Successful Installation Before You BeginHardware Options Description Cisco Spare Part NumberRemoving the Cover Beginning the InstallationTools and Supplies Needed Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Installing a Hard Drive Tray into the Appliance Removing the Front BezelRemoving the Hard Drive Tray Removing and Installing the Processor Air Duct Removing the Processor Air DuctTo remove the processor air duct Installing and Removing Memory Installing the Processor Air DuctBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving and Installing the PCI Adapter Card Removing DIMMsConfiguration Bottom Slot Middle Slot Top Slot Configuration Lower Slot Upper SlotRemoving the PCI Riser Assembly PCI riser assembly PinsRemoving a PCI Adapter Card Removing a Full-Height Adapter CardInstalling a PCI Adapter Card Installing or Replacing a Power Supply Installing the PCI Riser AssemblyReplacing a Redundant Power Supply AC and DC Power Supply ModulesReplacing a Nonredundant Power Supply Adding a New Redundant Power SupplyCompleting the Installation Installing the Cover231198 Page Troubleshooting Troubleshooting OverviewProblem Solving Troubleshooting the Power and Cooling Systems Environmental Reporting FeaturesTroubleshooting Adapter Cards, Cables, and Connections Reading the LEDs Front-Panel LEDsNIC LEDs Figure A-2 NIC 1 and NIC 2 LEDsProduct Serial Number Location Cisco Product Identification ToolPage Site Log Date InitialsMaintaining the Cisco ADE 2130 Appliance Maintaining Your Site EnvironmentGeneral Exterior Cleaning and Inspection Cables and ConnectorsAppliance Adapter CardsTemperature CoolingHumidity AltitudeElectrostatic Discharge Electromagnetic and Radio Frequency InterferencePower Source Interruptions MagnetismPage Numerics See ESD EMISee MOP NICPreventing effects RJ-45 pinout NIC Safety guidelines RFIIN-5 IN-6