Cisco Systems 2140, 2130 manual Stripping the Ground Wire

Page 65

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Cisco ADE 2130 and 2140 Series Appliance Power

Figure 3-10 Stripping the Ground Wire

0.5 in. (12.7 mm) ± 0.02 in. (0.5 mm)

Insulation

Wire lead

60528

Step 5 Slide the open end of a single 90° standard barrel, two-hole ground lug with 5/8-inch pitch over the exposed area of the 10-AWG wire.

Step 6 Using a crimping tool (as specified by the ground lug manufacturer), crimp the ground lug to the 10-AWG wire. (See Figure 3-11.)

Figure 3-11 Crimping a Ground Lug onto the Ground Wire

60529

Step 7 Use the two nuts that were installed on the ground studs to attach the ground lug and wire assembly to the two ground studs on the rear of the appliance.

Step 8 Use a torque wrench to tighten each nut to 10 in-lb (1.12 N-m) torque.

Step 9 Connect the other end of the ground wire to a suitable grounding point at your site.

Proceed to the next section,“Power Connections,” to continue the installation.

Power Connections

To ensure the appliance chassis power connection is adequate, you will need the following parts and tools:

18-AWG copper wire for the power cord

Wire-stripping tool for stripping the 18-AWG copper wire

Number 2 Phillips screwdriver

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

 

78-18579-02

3-15

 

 

 

Image 65
Contents Text Part Number Americas HeadquartersCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Objectives Document Revision HistoryAudience OrganizationChapter Title Description ConventionsBewaar Deze Instructies Safety WarningsAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Related Documentation Obtaining Documentation and Submitting a Service RequestXvi A P T E R Model Product OverviewProduct Serial Number Location Cisco ADE 2130 Series Appliance Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco Product Identification Tool Cisco ADE 2140 Series Appliance Specification Description Cisco Spare Part NumberGB Sdram CADE-RAM-25EF= CADE-2U-AC-PSU=Cisco ADE 2130 and 2140 Series Appliance Front View Hardware FeaturesColor State Description Front Control Panel LEDs and SwitchesCisco ADE 2130 and 2140 Series Appliance Rear View SwitchUsed used NIC LEDsAC and DC Power Supply LEDs Ethernet Port NIC 1 and NIC Input/Output Ports and ConnectorsType Description Ethernet Port Pin Signal DescriptionSerial Console Port Signal Description RTS CTS DTR DSR TXD RXD GND RJ-45-to-DB-9 Terminal Adapter ConsoleDC Power Supply Input AC and DC Power SuppliesEnvironmental Monitoring Overtemperature Protection OTPRegulatory Compliance Overcurrent Protection OCPA P T E R General Precautions Safety GuidelinesSafety with Electricity Safety with EquipmentPage Preventing Electrostatic Discharge Damage Site Planning Preparing Your Site for InstallationLifting Guidelines Post Open Rack Rack Installation Safety GuidelinesSite Environment Airflow Guidelines Temperature and Humidity GuidelinesSpecification Minimum Maximum Power ConsiderationsDC Power Supply Safety Considerations Method of ProcedureUnpacking and Checking the Contents of Your Shipment Cisco Part Number Cisco Information Packet and WarrantyReplacement, Repair, or Refund Policy for Hardware Duration of Hardware WarrantyTo Receive a Return Materials Authorization RMA Number Required Tools and EquipmentTask Verified by Date Installation ChecklistCreating a Site Log Serial Console Port Connections Ethernet and Console Port ConsiderationsNIC 1 and NIC 2 RJ-45 Ethernet Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance 2-Post Rack-Mount Kit Post Rack-Mount Hardware KitAttaching the L Brackets to the Appliance Mid-Mounting in a 2-Post RackAttaching an L Bracket to a Center Post Installing the Appliance in the Rack4-post Rails and Brackets Item No Description Quantity Attaching the Inner Slide Rails to the ApplianceAttaching the Outer Slide Rails to the Rack Installing the Appliance into the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Grounding the Rack Connecting the Appliance DC Power and GroundPower Connections Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network Interface Connecting the Network and Console CablesCable Management Connecting the ConsolePower-Up Procedure AC Power Supply Powering Up the Cisco ADE 2130 and 2140 Series ApplianceChecking the LEDs Power-Up Procedure DC Power SupplyADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Before You Begin Preparing for a Successful InstallationHardware Options Description Cisco Spare Part NumberRemoving the Cover Beginning the InstallationTools and Supplies Needed Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Removing the Front Bezel Installing a Hard Drive Tray into the ApplianceRemoving the Hard Drive Tray Removing the Processor Air Duct Removing and Installing the Processor Air DuctTo remove the processor air duct Installing the Processor Air Duct Installing and Removing MemoryBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving DIMMs Removing and Installing the PCI Adapter CardConfiguration Lower Slot Upper Slot Configuration Bottom Slot Middle Slot Top SlotPCI riser assembly Pins Removing the PCI Riser AssemblyRemoving a Full-Height Adapter Card Removing a PCI Adapter CardInstalling a PCI Adapter Card Installing the PCI Riser Assembly Installing or Replacing a Power SupplyAC and DC Power Supply Modules Replacing a Redundant Power SupplyAdding a New Redundant Power Supply Replacing a Nonredundant Power SupplyInstalling the Cover Completing the Installation231198 Page Troubleshooting Overview TroubleshootingProblem Solving Environmental Reporting Features Troubleshooting the Power and Cooling SystemsTroubleshooting Adapter Cards, Cables, and Connections Front-Panel LEDs Reading the LEDsFigure A-2 NIC 1 and NIC 2 LEDs NIC LEDsCisco Product Identification Tool Product Serial Number LocationPage Site Log Initials DateMaintaining Your Site Environment Maintaining the Cisco ADE 2130 ApplianceCables and Connectors General Exterior Cleaning and InspectionAppliance Adapter CardsCooling TemperatureAltitude HumidityElectrostatic Discharge Electromagnetic and Radio Frequency InterferenceMagnetism Power Source InterruptionsPage Numerics EMI See ESDNIC See MOPRFI Preventing effects RJ-45 pinout NIC Safety guidelinesIN-5 IN-6