Cisco Systems 2140, 2130 manual Power-Up Procedure DC Power Supply, Checking the LEDs

Page 71

Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Power-Up Procedure (DC Power Supply)

To power up a Cisco ADE 2130 and 2140 Series appliance with a DC power supply and verify its initialization and self-test, follow this procedure. When the procedure is finished, the appliance is ready to configure.

If a redundant power supply is used, separate DC power sources are needed for each power supply. This allows you to turn off power for one power supply without affecting the power source for the other.

Step 1 Review the information in the “Safety Guidelines” section on page 2-2.

Step 2 Plug the Molex terminal block connector into the power connector located on the rear right-hand side of the appliance. (See location 1 in Figure 1-5 on page 1-9.)

Step 3 Connect the DC power input wires to the DC power source at your installation site.

Step 4 Press the power button on the front of the appliance. (See location 9 in Figure 3-13 on page 3-21.)

The appliance should begin its powerup procedure.

Step 5 After the operating system boots up, observe the front-panel LEDs to verify that your system is operating

properly. (See Figure 3-13 on page 3-21and the “Checking the LEDs” section on page 3-21.)

Once the operating system boots, you are ready to initialize the basic software configuration. (See the software installation guide or user guide that shipped with your appliance, for proper configuration procedures.)

Checking the LEDs

When the Cisco ADE 2130 and 2140 Series appliance is up and running, observe the front-panel LEDs. (See Figure 3-13.)

Figure 3-13 Cisco ADE 2130 and 2140 Series Appliance Front Control Panel

A1 B2 C3 D4 E5

9I H8 G7 F6

231190

 

1

Appliance power LED

6

ID control switch (push button)

 

 

 

 

 

2

Appliance status LED

7

NMI (nonmaskable interrupt) recessed

 

 

 

 

 

button1

3

Hard disk drive activity LED

8

Reset push button

 

 

 

 

 

4

NIC activity (all NICs)

9

Appliance power push button

 

 

 

 

 

 

 

 

5

Appliance system ID LED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

78-18579-02

 

 

 

 

 

3-21

 

 

 

 

 

 

 

Image 71
Contents Text Part Number Americas HeadquartersCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Organization Document Revision HistoryObjectives AudienceChapter Title Description ConventionsBewaar Deze Instructies Safety WarningsAviso Instruções Importantes DE Segurança Warnung Wichtige SicherheitshinweiseAvvertenza Importanti Istruzioni Sulla Sicurezza Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Related Documentation Obtaining Documentation and Submitting a Service RequestXvi A P T E R Model Product OverviewProduct Serial Number Location Cisco ADE 2130 Series Appliance Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco Product Identification Tool CADE-2U-AC-PSU= Specification Description Cisco Spare Part NumberCisco ADE 2140 Series Appliance GB Sdram CADE-RAM-25EF=Cisco ADE 2130 and 2140 Series Appliance Front View Hardware FeaturesColor State Description Front Control Panel LEDs and SwitchesCisco ADE 2130 and 2140 Series Appliance Rear View SwitchUsed used NIC LEDsAC and DC Power Supply LEDs Ethernet Port NIC 1 and NIC Input/Output Ports and ConnectorsType Description Ethernet Port Pin Signal DescriptionSerial Console Port Signal Description RTS CTS DTR DSR TXD RXD GND RJ-45-to-DB-9 Terminal Adapter ConsoleDC Power Supply Input AC and DC Power SuppliesOvercurrent Protection OCP Overtemperature Protection OTPEnvironmental Monitoring Regulatory ComplianceA P T E R General Precautions Safety GuidelinesSafety with Electricity Safety with EquipmentPage Preventing Electrostatic Discharge Damage Site Planning Preparing Your Site for InstallationLifting Guidelines Post Open Rack Rack Installation Safety GuidelinesSite Environment Airflow Guidelines Temperature and Humidity GuidelinesSpecification Minimum Maximum Power ConsiderationsDC Power Supply Safety Considerations Method of ProcedureUnpacking and Checking the Contents of Your Shipment Cisco Part Number Cisco Information Packet and WarrantyRequired Tools and Equipment Duration of Hardware WarrantyReplacement, Repair, or Refund Policy for Hardware To Receive a Return Materials Authorization RMA NumberTask Verified by Date Installation ChecklistCreating a Site Log Serial Console Port Connections Ethernet and Console Port ConsiderationsNIC 1 and NIC 2 RJ-45 Ethernet Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance 2-Post Rack-Mount Kit Post Rack-Mount Hardware KitAttaching the L Brackets to the Appliance Mid-Mounting in a 2-Post RackAttaching an L Bracket to a Center Post Installing the Appliance in the Rack4-post Rails and Brackets Item No Description Quantity Attaching the Inner Slide Rails to the ApplianceAttaching the Outer Slide Rails to the Rack Installing the Appliance into the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Grounding the Rack Connecting the Appliance DC Power and GroundPower Connections Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network Interface Connecting the Network and Console CablesCable Management Connecting the ConsolePower-Up Procedure AC Power Supply Powering Up the Cisco ADE 2130 and 2140 Series ApplianceChecking the LEDs Power-Up Procedure DC Power SupplyADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Description Cisco Spare Part Number Preparing for a Successful InstallationBefore You Begin Hardware OptionsRemoving the Cover Beginning the InstallationTools and Supplies Needed Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Removing the Front Bezel Installing a Hard Drive Tray into the ApplianceRemoving the Hard Drive Tray Removing the Processor Air Duct Removing and Installing the Processor Air DuctTo remove the processor air duct Installing the Processor Air Duct Installing and Removing MemoryBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving DIMMs Removing and Installing the PCI Adapter CardConfiguration Lower Slot Upper Slot Configuration Bottom Slot Middle Slot Top SlotPCI riser assembly Pins Removing the PCI Riser AssemblyRemoving a Full-Height Adapter Card Removing a PCI Adapter CardInstalling a PCI Adapter Card Installing the PCI Riser Assembly Installing or Replacing a Power SupplyAC and DC Power Supply Modules Replacing a Redundant Power SupplyAdding a New Redundant Power Supply Replacing a Nonredundant Power SupplyInstalling the Cover Completing the Installation231198 Page Troubleshooting Overview TroubleshootingProblem Solving Environmental Reporting Features Troubleshooting the Power and Cooling SystemsTroubleshooting Adapter Cards, Cables, and Connections Front-Panel LEDs Reading the LEDsFigure A-2 NIC 1 and NIC 2 LEDs NIC LEDsCisco Product Identification Tool Product Serial Number LocationPage Site Log Initials DateMaintaining Your Site Environment Maintaining the Cisco ADE 2130 ApplianceAdapter Cards General Exterior Cleaning and InspectionCables and Connectors ApplianceCooling TemperatureElectromagnetic and Radio Frequency Interference HumidityAltitude Electrostatic DischargeMagnetism Power Source InterruptionsPage Numerics EMI See ESDNIC See MOPRFI Preventing effects RJ-45 pinout NIC Safety guidelinesIN-5 IN-6