Cisco Systems 2130, 2140 manual See ESD, Emi

Page 112

Index

cooling system

 

preventing damage

2-5,C-4

troubleshooting

A-3

preventing effects of

C-4

corrosion

 

Ethernet

 

preventing damage C-2

connections 2-16

 

CPI tool

 

Ethernet ports

 

identification

1-4,A-7

NIC 1-11

 

D

 

 

 

F

 

 

 

 

 

DC power up

 

 

 

features

 

 

 

 

 

procedure

3-21

 

 

environmental reporting

A-3

 

DIMMs

 

 

 

front panel

 

 

 

 

 

installing

4-11

 

 

LEDs and switches

1-7

 

 

removing

4-12

 

 

front view

 

 

 

 

 

dust

 

 

 

ADE 2130 and 2140 Series appliance 1-6

preventing damage

C-4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

E

 

 

 

general

 

 

 

 

 

 

 

 

 

 

 

 

 

 

electricity

 

 

 

precautions

2-2

 

 

 

safety with

2-3

 

 

guidelines

 

 

 

 

 

electromagnetic interference

 

airflow

2-9

 

 

 

See EMI

 

 

 

lifting

2-6

 

 

 

 

electrostatic discharge

 

 

rack installation 2-7

 

 

 

See ESD

 

 

 

rack-mounting configuration

3-2

EMI

 

 

 

safety

2-2

 

 

 

 

preventing effects of

C-4

 

temperature and humidity

2-9

environment

 

 

 

temperature maintenance

C-3

maintaining C-1

 

 

 

 

 

 

 

 

site 2-8

 

 

 

 

 

 

 

 

 

 

 

 

H

 

 

 

 

 

environmental

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

features A-3

 

 

hardware

 

 

 

 

 

specifications (table)

2-10

 

installing

3-1

 

 

 

equipment

 

 

 

options

4-2

 

 

 

racks

 

 

 

troubleshooting procedures

A-1

rack-mounting 2-9

 

hardware options (table)

4-2

 

 

safety with

2-3

 

 

humidity

 

 

 

 

 

ESD

 

maintenance guidelines C-4

 

 

 

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

 

 

 

 

 

 

 

 

 

IN-2

78-18579-02

 

 

 

Image 112
Contents Americas Headquarters Text Part NumberCopyright 2008 Cisco Systems, Inc. All rights reserved N T E N T S Lifting Guidelines Preparing Your Site for Installation Powering Up the Cisco ADE 2130 and 2140 Series Appliance Appliance C-2 About This Guide Document Revision History ObjectivesAudience OrganizationConventions Chapter Title DescriptionSafety Warnings Bewaar Deze InstructiesAvvertenza Importanti Istruzioni Sulla Sicurezza Warnung Wichtige SicherheitshinweiseAviso Instruções Importantes DE Segurança Spara Dessa Anvisningar GEM Disse Anvisninger Xiv Obtaining Documentation and Submitting a Service Request Related DocumentationXvi A P T E R Product Overview ModelProduct Serial Number Location Cisco Product Identification Tool Cisco ADE 2130 and 2140 Series Appliance ConfigurationsCisco ADE 2130 Series Appliance Specification Description Cisco Spare Part Number Cisco ADE 2140 Series ApplianceGB Sdram CADE-RAM-25EF= CADE-2U-AC-PSU=Hardware Features Cisco ADE 2130 and 2140 Series Appliance Front ViewFront Control Panel LEDs and Switches Color State DescriptionSwitch Cisco ADE 2130 and 2140 Series Appliance Rear ViewNIC LEDs Used usedAC and DC Power Supply LEDs Input/Output Ports and Connectors Ethernet Port NIC 1 and NICSerial Console Port Ethernet Port Pin Signal DescriptionType Description Signal Description RJ-45-to-DB-9 Terminal Adapter Console RTS CTS DTR DSR TXD RXD GNDAC and DC Power Supplies DC Power Supply InputOvertemperature Protection OTP Environmental MonitoringRegulatory Compliance Overcurrent Protection OCPA P T E R Safety Guidelines General PrecautionsSafety with Equipment Safety with ElectricityPage Preventing Electrostatic Discharge Damage Lifting Guidelines Preparing Your Site for InstallationSite Planning Rack Installation Safety Guidelines Post Open RackSite Environment Temperature and Humidity Guidelines Airflow GuidelinesPower Considerations Specification Minimum MaximumMethod of Procedure DC Power Supply Safety ConsiderationsUnpacking and Checking the Contents of Your Shipment Cisco Information Packet and Warranty Cisco Part NumberDuration of Hardware Warranty Replacement, Repair, or Refund Policy for HardwareTo Receive a Return Materials Authorization RMA Number Required Tools and EquipmentCreating a Site Log Installation ChecklistTask Verified by Date NIC 1 and NIC 2 RJ-45 Ethernet Connections Ethernet and Console Port ConsiderationsSerial Console Port Connections 78-18579-02 Page Installing the Cisco ADE 2130 and 2140 Series Appliance Rack-Mounting Configuration Guidelines Installing the Cisco ADE 2130 and 2140 Series Appliance Post Rack-Mount Hardware Kit 2-Post Rack-Mount KitMid-Mounting in a 2-Post Rack Attaching the L Brackets to the ApplianceInstalling the Appliance in the Rack Attaching an L Bracket to a Center Post4-post Rails and Brackets Attaching the Inner Slide Rails to the Appliance Item No Description QuantityInstalling the Appliance into the Rack Attaching the Outer Slide Rails to the RackInstalling Appliance into Rack Cisco ADE 2130 and 2140 Series Appliance Power Connecting the Appliance AC Power Power Connections Connecting the Appliance DC Power and GroundGrounding the Rack Grounding Connections 10 Stripping the Ground Wire Wiring the DC-Input Power Source 12 Stripping the Power Wire Connecting the Network and Console Cables Connecting the Network InterfaceConnecting the Console Cable ManagementPowering Up the Cisco ADE 2130 and 2140 Series Appliance Power-Up Procedure AC Power SupplyPower-Up Procedure DC Power Supply Checking the LEDsADE 2130 and 2140 Appliance Front-Panel LEDs A P T E R Preparing for a Successful Installation Before You BeginHardware Options Description Cisco Spare Part NumberTools and Supplies Needed Beginning the InstallationRemoving the Cover Removing the Cisco ADE 2130 and 2140 Series Appliance Cover Installing a Hard Drive Tray into the Appliance Removing the Front BezelRemoving the Hard Drive Tray Removing and Installing the Processor Air Duct Removing the Processor Air DuctTo remove the processor air duct Installing and Removing Memory Installing the Processor Air DuctBranch Channel B Channel a Installing DIMMs Installing DIMMsRemoving and Installing the PCI Adapter Card Removing DIMMsConfiguration Bottom Slot Middle Slot Top Slot Configuration Lower Slot Upper SlotRemoving the PCI Riser Assembly PCI riser assembly PinsRemoving a PCI Adapter Card Removing a Full-Height Adapter CardInstalling a PCI Adapter Card Installing or Replacing a Power Supply Installing the PCI Riser AssemblyReplacing a Redundant Power Supply AC and DC Power Supply ModulesReplacing a Nonredundant Power Supply Adding a New Redundant Power SupplyCompleting the Installation Installing the Cover231198 Page Troubleshooting Troubleshooting OverviewProblem Solving Troubleshooting the Power and Cooling Systems Environmental Reporting FeaturesTroubleshooting Adapter Cards, Cables, and Connections Reading the LEDs Front-Panel LEDsNIC LEDs Figure A-2 NIC 1 and NIC 2 LEDsProduct Serial Number Location Cisco Product Identification ToolPage Site Log Date InitialsMaintaining the Cisco ADE 2130 Appliance Maintaining Your Site EnvironmentGeneral Exterior Cleaning and Inspection Cables and ConnectorsAppliance Adapter CardsTemperature CoolingHumidity AltitudeElectrostatic Discharge Electromagnetic and Radio Frequency InterferencePower Source Interruptions MagnetismPage Numerics See ESD EMISee MOP NICPreventing effects RJ-45 pinout NIC Safety guidelines RFIIN-5 IN-6