oMCS-200 dual-rack configuration

The leveling feet pads help to ensure weight distribution and help transfer the load to the support structure below the floor. You must ensure proper orientation of the feet pads so that subsequent racks can be properly accommodated.

Floor loading considerations

The computer room floor must be able to support the total weight of the installed server trays as well as the weight of the MCS-200/100 as they are moved into position. This section contains information about raised floor installations. HP cannot assume responsibility for determining the suitability of a particular raised floor system. The customer or local agencies should determine installation requirements. An appropriate structural engineer should verify any floor system under consideration for a server installation.

Raised floor loading is a function of the manufacturer’s load specification and the positioning of the equipment relative to the raised floor grid. HP recommends the following guidelines:

Some raised floor systems do not have grid stringers between floor stands. The lateral support for the floor stands depends on adjacent panels being in place. To avoid compromising this type of floor system when gaining under-floor access, remove only one floor panel at a time.

Larger floor grids (bigger panels) are generally rated for lighter loads.

MCS-200/100 both support approximately up to 1361 kg (3000 lb) of static loads of equipment on the leveling feet and feet pads.

Facility planning for implementation 37

Image 37
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Facility planning overview Facility planning for implementationSpace and positioning considerations Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Electrical considerations WeightTerm Description RatingSystem grounding MCS-200 Raised floor grounding Description Voltage fluctuations and outages Connecting to facility A/C powerElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Rear view Raised floor cutouts for the MCS unitMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsEnvironmental considerations Before installing and running active componentsControl system Plumbing materials to avoidFacility planning for implementation Dimension Measurement Appendix a Forms and checklistsDelivery survey form Site preparation checklist Pre-installation checklistsArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasWarranty information Regulatory requirements for Exit signs Safety and regulatory complianceRegulatory information Regulatory information Before you contact HP Support and other resourcesHP contact information Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb