HP Modular Cooling System Operational space requirements, MCS-200/100 expansion rack Reference

Page 23

MCS-200/100 expansion rack

Item

1

2

3

Reference

MCS-200/100 expansion rack shock pallet

4-piece ramp

MCS-200 expansion rack (MCS-100 expansion rack not shown)

Operational space requirements

To provide space for internal airflow and housing of the cooling unit components, the MCS-200/100 is wider and deeper than conventional HP racks.

HP recommends the minimum access space for the MCS-200/100 be 1219 mm (4 ft) in the front and 914 mm (3 ft) in the rear, as shown in the following figures.

With the top shipping bracket, the total height is 2069 mm (81.5 inches).

The MCS-200/100 unit requires approximately 600 mm of additional width (space) to accommodate the second IT rack, which is mounted to the left of the cooling unit.

Facility planning for implementation 23

Image 23
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Space and positioning considerations Facility planning for implementation Facility planning overview Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Electrical planning around water-handling components Connecting to facility A/C powerVoltage fluctuations and outages Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view MCS-100 floor tile cutouts Raised floor cutouts for the MCS unitRear view Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control systemFacility planning for implementation Delivery survey form Appendix a Forms and checklistsDimension Measurement Area/condition Yes Comment/date Pre-installation checklistsSite preparation checklist Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasRegulatory information Safety and regulatory complianceWarranty information Regulatory requirements for Exit signs Regulatory information HP contact information Support and other resourcesBefore you contact HP Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist