HP Modular Cooling System manual

Page 73

Number of fans

HP Modular

HP Modular

MCS-200/100

MCS-200/100 with

 

Cooling System

Cooling System

 

Expansion Rack

 

200/100

200/100 with

 

 

 

 

Expansion Rack

 

 

 

 

 

 

 

4 fans

30kW, 2,800 CFM

15kW, 1,400 CFM

30kW, 3,000 CFM

15kW, 1,600 CFM

 

N+1 Redundancy

N+1 Redundancy

 

 

5 fans

N/A

N/A

40kW, 3, 750 CFM

20kW, 2,000 CFM

 

 

 

or 30kW N+1

or 15kW N+1

6 fans

N/A

N/A

50kW, 4,500 CFM

30kW, 2,400 CFM

 

 

 

or 40kW N+1,

or 20kW N+1, or

 

 

 

30kW N+2

15kW N+2

 

 

 

 

 

Cooling performance is rated at 43 ˚F EWT. MCS with Expansion Rack capacity/airflow is pooled and does not have to be evenly split between racks. For example, the HP Modular Cooling System 200/100 with 3 fans, provides at total of 2,800 CFM. One rack can use 2,000 CFM and the other can use 800 CFM.

A minimum heat load is necessary for operating the MCS-200/100 properly. This minimum depends on the water supply temperature as shown in the following table.

MCS-200 minimum heat loads

Server air intake

Water supply

Minimum heat load

temperature

temperature

 

 

 

 

20°C (68ºF)

7ºC (45°F)

9 kW

 

10ºC (50°F)

7 kW

 

 

 

 

13ºC (55°F)

6 kW

 

 

 

 

16ºC (61°F)

6 kW

 

 

 

25°C (77ºF)

7–13°C (45–55°F)

16 kW

 

16ºC (61°F)

14 kW

 

 

 

 

18ºC (64°F)

10 kW

 

 

 

MCS-100 minimum heat loads

 

 

 

 

Server air intake

Water supply

Minimum heat load

temperature

temperature

 

 

 

 

20 C (68 F)

7ºC (45°F)

13 kW

 

11ºC (52°F)

7.5 kW

 

 

 

 

15ºC (59°F)

5 kW

 

 

 

 

19ºC (66°F)

3 kW

 

 

 

25 C (77 F)

11ºC (52°F)

13 kW

 

15ºC (59°F)

12 kW

 

 

 

 

11ºC (66°F)

6 kW

 

 

 

 

23ºC (73°F)

3 kW

 

 

 

30 C (86 F)

17ºC (63°F)

15 kW

 

21ºC (70°F)

13 kW

 

 

 

 

25ºC (77°F)

6 kW

 

 

 

 

29ºC (84°F)

3 kW

 

 

 

Facility planning for implementation 73

Image 73
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Facility planning overview Facility planning for implementationSpace and positioning considerations Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Electrical considerations WeightTerm Description RatingSystem grounding MCS-200 Raised floor grounding Description Voltage fluctuations and outages Connecting to facility A/C powerElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Rear view Raised floor cutouts for the MCS unitMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description Specifications Watts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsEnvironmental considerations Before installing and running active componentsControl system Plumbing materials to avoidFacility planning for implementation Dimension Measurement Appendix a Forms and checklistsDelivery survey form Site preparation checklist Pre-installation checklistsArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasWarranty information Regulatory requirements for Exit signs Safety and regulatory complianceRegulatory information Regulatory information Before you contact HP Support and other resourcesHP contact information Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist