HP Modular Cooling System manual Fittings Astm B16.22 Wrought copper

Page 68

Recommended plumbing configuration for the MCS-200/100

Typical plumbing components for an MCS-200/100 configuration

Item

Description

Specifications

 

 

 

1

Chilled water return line

Pipe: 31.75-mm (1.25-inch), ASTM B 88, Type L, hard-drawn copper

 

 

Fittings: ASTM B16.22 Wrought copper

 

 

Solder: ASTM B 32, 95-5 Tin Antimony

 

 

Thread sealant: seal and assemble according to local materials and

 

 

practices

 

 

 

2

Flow/measurement

Valve type: 31.75-mm (1.25-inch) bronze balancing valve, ball design,

 

balancing valve

with positive shutoff, integral checked metering ports, adjustable knob,

 

 

memory device, calibrated nameplate, integral drain port, and solder

 

 

end connections

 

 

Position: horizontal run of pipe

 

 

Orient drain port toward MCS-200/100. Avoid fittings closer to

 

 

measurement valve than five pipe diameters upstream and two pipe

 

 

diameters downstream for maximum performance.

 

 

Watts CSM-61 or equivalent, typical 1

 

 

 

3

Pipe

31.75 mm (1.25 inches) copper, male (NPT or BSPP) adapter to

 

 

connect the MCS-200/100 water hoses, typical 2

4

Isolation valves

Valve type: 31.75-mm (1.25-inch), two-piece, full-port, brass ball valve,

 

 

with chrome plated brass ball, PTFE seats, steel handle, with female

 

 

connections and 31.75-mm (1.25-inch) bushing on the end toward

 

 

MCS-200/100 hoses.

 

 

Pressure rating: 600 psi WOG, 150 psi WSP

 

 

Watts FBV-3C or equivalent

 

 

 

5

Chilled water supply

Pipe: 31.75-mm (1.25-inch), ASTM B 88, Type L, hard-drawn copper

 

line

Fittings: ASTM B16.22 Wrought copper

 

 

Solder: ASTM B 32, 95-5 Tin Antimony

 

 

Thread sealant: Seal and assemble according to local materials and

 

 

practices

 

 

 

Facility planning for implementation 68

Image 68
Contents HP Modular Cooling System 200/100 Site Preparation Guide Part Number June EditionPage Contents Appendix B Conversion factors and formulas Before you contact HP HP contact informationOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view Physical specifications MCS-100 expansion rack physical specificationsElectrical specifications Parameter Value Comments Space and positioning considerations Facility planning for implementationFacility planning overview Delivery space requirements Maneuvering space requirementsMCS-200/100 Reference Operational space requirements MCS-200/100 expansion rack ReferenceFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Cabinet leveling feet Top view Bottom viewFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Weight Electrical considerationsTerm Description RatingSystem grounding MCS-200 Raised floor grounding Description Electrical planning around water-handling components Connecting to facility A/C powerVoltage fluctuations and outages Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view MCS-100 floor tile cutouts Raised floor cutouts for the MCS unitRear view Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Description Specifications StrainerTypical plumbing installation guidelines Watts TP or equivalentCoolant requirements General thermal requirementsCooling loop sizing Determining heat load capacitiesPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Acceptable water quality specifications Additional water precautionsBefore installing and running active components Environmental considerationsControl system Plumbing materials to avoidFacility planning for implementation Delivery survey form Appendix a Forms and checklistsDimension Measurement Area/condition Yes Comment/date Pre-installation checklistsSite preparation checklist Safety considerations Appendix a Forms and checklists Appendix B Conversion factors and formulas Conversion factors and formulasRegulatory information Safety and regulatory complianceWarranty information Regulatory requirements for Exit signs Regulatory information HP contact information Support and other resourcesBefore you contact HP Acronyms and abbreviations Uninterruptible power system Water steam pressureDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb