HP Modular Cooling System manual Contents

Page 3

Contents

Overview

5

Overview

5

Product overview

8

Key components

12

MCS-100 components

13

MCS-200 components

15

Physical specifications

17

Electrical specifications

18

Facility planning for implementation

20

Facility planning overview

20

Space and positioning considerations

20

Delivery space requirements

21

Maneuvering space requirements

21

Operational space requirements

23

System positioning

25

Cable openings

26

Cabinet leveling feet

29

Floor loading considerations

37

Electrical considerations

40

System grounding

41

Voltage fluctuations and outages

43

Electrical planning around water-handling components

43

Connecting to facility A/C power

43

Coolant source planning

45

Plumbing considerations

46

Piping approaches

51

Hose openings

52

Raised floor cutouts for the MCS unit

55

Chilled water system components

67

Typical plumbing installation guidelines

70

Coolant requirements

71

General thermal requirements

71

Cooling loop sizing

72

Determining heat load capacities

72

Acceptable water quality specifications

78

Additional water precautions

78

Plumbing materials to avoid

79

Environmental considerations

79

Control system

79

Before installing and running active components

79

Appendix A: Forms and checklists

81

Delivery survey form

81

Pre-installation checklists

82

Site preparation checklist

82

Contents 3

Image 3
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Facility planning for implementation Facility planning overviewSpace and positioning considerations Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Connecting to facility A/C power Voltage fluctuations and outagesElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Raised floor cutouts for the MCS unit Rear viewMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control systemFacility planning for implementation Appendix a Forms and checklists Dimension MeasurementDelivery survey form Pre-installation checklists Site preparation checklistArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasSafety and regulatory compliance Warranty information Regulatory requirements for Exit signsRegulatory information Regulatory information Support and other resources Before you contact HPHP contact information Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb