Contents
Overview | 5 |
Overview | 5 |
Product overview | 8 |
Key components | 12 |
13 | |
15 | |
Physical specifications | 17 |
Electrical specifications | 18 |
Facility planning for implementation | 20 |
Facility planning overview | 20 |
Space and positioning considerations | 20 |
Delivery space requirements | 21 |
Maneuvering space requirements | 21 |
Operational space requirements | 23 |
System positioning | 25 |
Cable openings | 26 |
Cabinet leveling feet | 29 |
Floor loading considerations | 37 |
Electrical considerations | 40 |
System grounding | 41 |
Voltage fluctuations and outages | 43 |
Electrical planning around | 43 |
Connecting to facility A/C power | 43 |
Coolant source planning | 45 |
Plumbing considerations | 46 |
Piping approaches | 51 |
Hose openings | 52 |
Raised floor cutouts for the MCS unit | 55 |
Chilled water system components | 67 |
Typical plumbing installation guidelines | 70 |
Coolant requirements | 71 |
General thermal requirements | 71 |
Cooling loop sizing | 72 |
Determining heat load capacities | 72 |
Acceptable water quality specifications | 78 |
Additional water precautions | 78 |
Plumbing materials to avoid | 79 |
Environmental considerations | 79 |
Control system | 79 |
Before installing and running active components | 79 |
Appendix A: Forms and checklists | 81 |
Delivery survey form | 81 |
82 | |
Site preparation checklist | 82 |
Contents 3