HP Modular Cooling System manual Piping approaches

Page 51

of 8 mm (0.31 inch). The preferred method of routing for all hoses is downward at an angle of at least 3º (pitch of 0.6 inch per 12 inches), without loops, and away from the MCS-200/100 cabinet. For MCS-200 only, pumped condensation and gravity-fed overflow hoses must be routed to a floor drain or reclaim system.

Flexible attachment hoses are intended to allow for deflection in any direction for equipment mounted on dynamic platforms, or for slight relocation of cabinets. Installation service for this MCS-200/100 is order number UE005E.

Piping approaches

HP recommends the following methods for facility plumbing orientation of the MCS-200/100:

Direct rear approach

Left rear approach

Right rear approach

You can approach the MCS-200/100 from the front with piping for the top and bottom connection. This approach, however, requires careful planning for accessible component locations and hose attachments.

Facility planning for implementation 51

Image 51
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Facility planning for implementation Facility planning overviewSpace and positioning considerations Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Connecting to facility A/C power Voltage fluctuations and outagesElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Raised floor cutouts for the MCS unit Rear viewMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control systemFacility planning for implementation Appendix a Forms and checklists Dimension MeasurementDelivery survey form Pre-installation checklists Site preparation checklistArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasSafety and regulatory compliance Warranty information Regulatory requirements for Exit signsRegulatory information Regulatory information Support and other resources Before you contact HPHP contact information Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist