HP Modular Cooling System manual Safety considerations

Page 83

Item

Area/condition

Yes

No

Comment/date

 

 

 

 

 

6

Is there a dedicated branch circuit for equipment?

 

 

 

 

 

 

 

 

7

Is there a dedicated branch circuit less than 22.86 m (75 ft) away?

 

 

 

 

 

 

 

 

8

Are the input circuit breakers sized to protect their respective

 

 

 

 

receptacles for equipment loads?

 

 

 

Safety considerations

Item

Area/condition

Yes

No

Comment/date

 

 

 

 

 

1

Is there an emergency power shutoff switch?

 

 

 

 

 

 

 

 

2

Is there a telephone available for emergency purposes?

 

 

 

 

 

 

 

 

3

Is there a fire protection system in the computer room?

 

 

 

 

 

 

 

 

4

Is antistatic flooring installed?

 

 

 

 

 

 

 

 

Cooling considerations

Item

Area/condition

Yes

No

Comment/date

 

 

 

 

 

1

Can the room temperature be maintained between the recommended

 

 

 

 

range of 20°C to 25°C (68°F to 77°F) and allowable range of 15°C

 

 

 

 

to 32°C (59°F to 90°F) (up to 5,000 ft)? Derate 1°C/1,000 ft above

 

 

 

 

5,000 ft and up to 10,000 ft.

 

 

 

2

Can the humidity level be maintained at the recommended level of

 

 

 

 

40% to 50%, with allowable humidity levels of 20% to 60%?

 

 

 

3

Are air conditioning filters installed and clean?

 

 

 

 

 

 

 

 

Water preparation considerations

Item

Area/condition

Yes

No

Comment/date

 

 

 

 

 

 

 

1

Has the water been tested for acceptable quality for use in the HP

 

 

 

 

 

Modular Cooling System 200/100?

 

 

 

 

2

If the water quality is unacceptable, have adequate treatment

 

 

 

 

 

filtration measures been put in place?

 

 

 

 

3

Have the water temperature and flow been evaluated?

 

 

 

 

 

 

 

 

 

 

4

Has piping of an appropriate diameter, material, and pressure

 

 

 

 

 

tolerance been installed to reach the back of each MCS-100 and

 

 

 

 

 

MCS-200/100?

 

 

 

 

5

Is there a provision for fluid collected from the condensation and

 

 

 

 

 

overflow hoses at each MCS-100 and MCS-200/100?

 

 

 

 

6

Is there dedicated cabinet space for storage of water quality

 

 

 

 

 

chemicals and gloves?

 

 

 

 

7

Is there an available space to prepare and handle chemicals before

 

 

 

 

 

adding them to the system?

 

 

 

 

8

Is Nalprep 8349 (commercially available from Nalco Company)

 

 

 

 

 

available on site for the secondary loop cleaning procedure?

 

 

 

 

9

Has the approximate volume of water in the entire system been

 

 

 

 

 

determined? (Necessary for water chemical preparation)

 

 

 

 

10

Have the water treatment chemicals been evaluated and approved

 

 

 

 

 

through your facility EHS department?

 

 

 

 

 

 

Appendix A: Forms and checklists 83

Image 83
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Space and positioning considerations Facility planning for implementationFacility planning overview Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Electrical planning around water-handling components Connecting to facility A/C powerVoltage fluctuations and outages Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view MCS-100 floor tile cutouts Raised floor cutouts for the MCS unitRear view Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control system Facility planning for implementation Delivery survey form Appendix a Forms and checklistsDimension Measurement Area/condition Yes Comment/date Pre-installation checklistsSite preparation checklist Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasRegulatory information Safety and regulatory complianceWarranty information Regulatory requirements for Exit signs Regulatory information HP contact information Support and other resourcesBefore you contact HP Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist