HP Modular Cooling System manual Key components

Page 12

Air flow for MCS-200 (dual-rack configuration)

The special horizontal airflow of the MCS-200/100 fully supports the industry standard front-to-back cooling principle, such as cold air drawing into the front of the server and warm air being expelled out the rear of the unit. All devices receive adequate and evenly distributed cool air regardless of the mounting position within the enclosure. The MCS-200/100 distributes precisely cooled and targeted air flow evenly across the front of the IT equipment. Warmed air is then channeled from the rear of the IT equipment into the side-mounted or center-mounted MCS-200/100 cooling unit. From there it is cooled and recirculated to the front of the equipment stack.

Key components

The MCS-200/100 uses the following key components to provide cooling performance. Some of these components are optional for MCS-100. For more information, see "MCS-100 components (on page 13)."

Main breakers—Provide power for the MCS-200/100 through circuit breakers. They do not control power at the input panel.

If the MCS-200/100 is still connected to a power source, voltage is applied before the circuit breakers at the input panel

Heat Exchanger Module (HEX)—Uses an air-to-water heat transfer device specially created for demanding data center environments

Display—Provides general cooling unit status

Management module—Provides users with web-based capabilities to set, monitor, and control temperature within the modular cooling unit, and displays the health of the unit

Overview 12

Image 12
Contents HP Modular Cooling System 200/100 Site Preparation Guide Part Number June EditionPage Contents Appendix B Conversion factors and formulas Before you contact HP HP contact informationOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view Physical specifications MCS-100 expansion rack physical specificationsElectrical specifications Parameter Value Comments Facility planning for implementation Facility planning overviewSpace and positioning considerations Delivery space requirements Maneuvering space requirementsMCS-200/100 Reference Operational space requirements MCS-200/100 expansion rack ReferenceFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Cabinet leveling feet Top view Bottom viewFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Weight Electrical considerationsTerm Description RatingSystem grounding MCS-200 Raised floor grounding Description Connecting to facility A/C power Voltage fluctuations and outagesElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Raised floor cutouts for the MCS unit Rear viewMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Description Specifications StrainerTypical plumbing installation guidelines Watts TP or equivalentCoolant requirements General thermal requirementsCooling loop sizing Determining heat load capacitiesPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Acceptable water quality specifications Additional water precautionsBefore installing and running active components Environmental considerationsControl system Plumbing materials to avoidFacility planning for implementation Appendix a Forms and checklists Dimension MeasurementDelivery survey form Pre-installation checklists Site preparation checklistArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Appendix B Conversion factors and formulas Conversion factors and formulasSafety and regulatory compliance Warranty information Regulatory requirements for Exit signsRegulatory information Regulatory information Support and other resources Before you contact HPHP contact information Acronyms and abbreviations Uninterruptible power system Water steam pressureDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb