HP Modular Cooling System manual Raised floor cutouts for the MCS unit, Rear view

Page 55

Rear view

Raised floor cutouts for the MCS unit

A complete MCS-200/100 installation typically requires the following floor cutouts in a raised-floor facility (standard rack configuration):

One floor cutout for the chilled water hoses and drain hoses of the cooling unit

One floor cutout for the power cords and data cables of the computer equipment rack, including power supply to the MCS-200/100. For more information on the top openings, see "Cable openings (on page 26)."

Raised floor panels vary in size globally but create virtual grid lines or seams where panels come together. These seams are ideal for positioning computer racks on the raised floor. The following figures reference the locations of rack attributes aligned with raised floor seams to provide critical dimensions for floor cutouts.

MCS-100 floor tile cutouts

Facility planning for implementation 55

Image 55
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Facility planning overview Facility planning for implementationSpace and positioning considerations Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Voltage fluctuations and outages Connecting to facility A/C powerElectrical planning around water-handling components Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view Rear view Raised floor cutouts for the MCS unitMCS-100 floor tile cutouts Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control systemFacility planning for implementation Dimension Measurement Appendix a Forms and checklistsDelivery survey form Site preparation checklist Pre-installation checklistsArea/condition Yes Comment/date Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasWarranty information Regulatory requirements for Exit signs Safety and regulatory complianceRegulatory information Regulatory information Before you contact HP Support and other resourcesHP contact information Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist