HP Modular Cooling System manual System grounding

Page 41

The MCS-200 provides two Walther Procon A5 series AC input connections and ships with one set of two power cords for connecting to redundant AC power busses, when available. Only one power cord is necessary for operation. The second cord can be connected to a redundant AC power bus to improve system availability by protecting against power source failures or accidentally tripped circuit breakers.

These redundant connections and cords are optional for the MCS-100.

For more information, see "Connecting to facility A/C power (on page 43)."

System grounding

HP server systems require two methods of grounding: power distribution grounding for safety, and high-frequency signal grounding for equipment performance. Power distribution grounding involves the main building electrical service entrance, electrical conduit, facility power panels, and equipment cabinets (including the MCS-200/100 and server cabinets), which should be grounded using green or yellow insulated wire conductors according to the applicable electrical codes. High-frequency grounding consists of using ground return conductors for intra- and inter-cabinet signal interconnects as well as chassis and cabinet grounding.

For MCS-200/100 and server systems installed on a raised floor, the floor assembly should be electrically grounded to form a complete ground grid. An optimum raised-floor grounding solution is shown in the following figure.

Each floor panel should have at least one supporting pedestal grounded to the power panel and another pedestal grounded to an equipment cabinet. This broadband solution provides excellent grounding for improved safety and performance.

Central ground stud location inside the IT rack

MCS-100

Facility planning for implementation 41

Image 41
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Space and positioning considerations Facility planning for implementationFacility planning overview Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Electrical considerations WeightTerm Description RatingSystem grounding MCS-200 Raised floor grounding Description Electrical planning around water-handling components Connecting to facility A/C powerVoltage fluctuations and outages Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view MCS-100 floor tile cutouts Raised floor cutouts for the MCS unitRear view Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsEnvironmental considerations Before installing and running active componentsControl system Plumbing materials to avoidFacility planning for implementation Delivery survey form Appendix a Forms and checklistsDimension Measurement Area/condition Yes Comment/date Pre-installation checklistsSite preparation checklist Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasRegulatory information Safety and regulatory complianceWarranty information Regulatory requirements for Exit signs Regulatory information HP contact information Support and other resourcesBefore you contact HP Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb