HP Modular Cooling System manual Coolant requirements, General thermal requirements

Page 71

Coolant requirements

General thermal requirements

The following table lists the coolant requirements that the facility must meet in order to support an MCS-200/100 installation. In addition to the requirements listed, the coolant must meet the requirements prescribed in the "Acceptable water quality specifications (on page 78)" section.

Parameter

Value

 

 

Maximum heat load operational chilled water temperature 1

7°C (45°F) minimum

Minimum

Maximum

13°C (55°F) maximum

Chilled water flow rate (maximum) 1

Approximately 80 lpm(21 gpm)

MCS-100

MCS-200

Approximately 159 lpm (42 gpm)

Inlet/outlet water connections to MCS-200/100 2 (2) 2

1.75-inch BSPP (parallel-thread)

Inlet/outlet hose connections to facility

1.25-inch BSPP (parallel-thread)

Hose insulation thickness

6.3 mm (0.25 inch), min. closed cell

Condensate discharge tubing

3 m (118 inch) length,

 

8 mm (0.31 inch) outer diameter,

 

6 mm (0.24 inch) inner diameter

 

 

Overflow tubing

3 m (118 inches) length,

 

15 mm (0.59 inch) outer diameter,

 

9 mm (0.35 inch) inner diameter

 

 

Chilled water pressure differential at required flow

1 - 1.5 bar (15 – 22 psi) required 1

Cooling capacity 1

30 kW maximum

MCS-100

MCS-200

50 kW maximum

 

(Performance is affected by water

 

temperature)

 

 

1For more information, see "Determining heat load capacities (on page 72)."

2For more information, see "Plumbing considerations (on page 46)."

Perform the following steps to confirm that the coolant requirements and corresponding resources necessary for effective implementation of the MCS-200/100:

1.Determine the maximum server heat load capacity.

2.Determine the desired server intake temperature. For more information, see the Rack Cooling Sizing Chart in "Cooling loop sizing (on page 72)."

3.Consult the building cooling system administration, and obtain the maximum coolant temperature, for example, 12.5ºC.

4.Find the amount of coolant required. For more information, see "Coolant source planning (on page 45)."

Facility planning for implementation 71

Image 71
Contents Part Number June Edition HP Modular Cooling System 200/100 Site Preparation GuidePage Contents Before you contact HP HP contact information Appendix B Conversion factors and formulasOverview OverviewMCS-100 unit dual-rack configuration MCS-200 unit single-rack configuration Product overview Air flow for MCS-100 single-rack configuration Air flow for MCS-100 dual-rack configuration Air flow for MCS-200 single-rack configuration Key components MCS-100 components Description MCS-200 components Unit top view MCS-100 expansion rack physical specifications Physical specificationsElectrical specifications Parameter Value Comments Space and positioning considerations Facility planning for implementationFacility planning overview Maneuvering space requirements Delivery space requirementsMCS-200/100 Reference MCS-200/100 expansion rack Reference Operational space requirementsFacility planning for implementation System positioning Cable openings Facility planning for implementation Facility planning for implementation Top view Bottom view Cabinet leveling feetFacility planning for implementation MCS-100 dual-rack configuration IT rack side view MCS-100 single-rack configuration Facility planning for implementation MCS-200 single-rack configuration MCS-200 dual-rack configuration IT rack side view MCS-200 single-rack configuration Floor loading considerations Facility planning for implementation Page Rating WeightElectrical considerations Term DescriptionSystem grounding MCS-200 Raised floor grounding Description Electrical planning around water-handling components Connecting to facility A/C powerVoltage fluctuations and outages Facility planning for implementation Coolant source planning Plumbing considerations HP Water Hook-Up Kit M6 screw Above the floor for MCS-200 only Facility planning for implementation Piping approaches Hose openings Bottom view Top view MCS-200 hose openings Bottom view Top view MCS-100 floor tile cutouts Raised floor cutouts for the MCS unitRear view Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Chilled water system components Fittings Astm B16.22 Wrought copper Strainer Description SpecificationsWatts TP or equivalent Typical plumbing installation guidelinesGeneral thermal requirements Coolant requirementsDetermining heat load capacities Cooling loop sizingPage Facility planning for implementation Facility planning for implementation Facility planning for implementation Facility planning for implementation Additional water precautions Acceptable water quality specificationsPlumbing materials to avoid Before installing and running active componentsEnvironmental considerations Control systemFacility planning for implementation Delivery survey form Appendix a Forms and checklistsDimension Measurement Area/condition Yes Comment/date Pre-installation checklistsSite preparation checklist Safety considerations Appendix a Forms and checklists Conversion factors and formulas Appendix B Conversion factors and formulasRegulatory information Safety and regulatory complianceWarranty information Regulatory requirements for Exit signs Regulatory information HP contact information Support and other resourcesBefore you contact HP Acronyms and abbreviations Water steam pressure Uninterruptible power systemDocumentation feedback Index Site preparation checklist
Related manuals
Manual 10 pages 27.17 Kb Manual 84 pages 16.27 Kb Manual 4 pages 15.71 Kb Manual 16 pages 5.24 Kb Manual 83 pages 40.42 Kb Manual 60 pages 37.09 Kb