Teledyne manual Installation Model 7300A Primary Input Power, Fuse Installation, Analog Outputs

Page 16

2 Installation

Model 7300A

 

 

 

 

 

 

 

 

 

2.3.1 Primary Input Power

The power cord receptacle and fuse block are located in the same assembly. Insert the power cord into the power cord receptacle.

DANGER: POWER IS APPLIED TO THE INSTRUMENT'S CIR- CUITRY AS LONG AS THE INSTRUMENT IS CON- NECTED TO THE POWER SOURCE. THE STANDBY ON THE FRONT PANEL IS FOR SWITCHING POWER ON OR OFF TO THE DISPLAYS AND OUT- PUTS ONLY.

The standard power supply requires a 110 V ac, 50-60 Hz power source, or 220 V ac, 50-60 Hz power (optional).

2.3.2 Fuse Installation

The fuse block, at the right of the power cord receptacle, accepts US or European size fuses. A jumper replaces the fuse in whichever fuse receptacle is not used.

2.3.3 50-Pin Equipment Interface Connector

Figure 2-1 shows the pin layout of the Equipment Interface connector. The arrangement is shown as seen when the viewer faces the rear panel of the analyzer. The pin numbers for each input/output function are given where each function is described in the paragraphs below.

Figure 2-1: Equipment Interface Connector Pin Arrangement

2.3.3.1Analog Outputs

There are four DC output signal pins—two pins per output. For polar- ity, see Table 3-1. The outputs are:

0–1 V dc % of Range: Voltage rises linearly with increasing concentration, from 0 V at 0 concentration to 1 V at full scale. (Full scale = 100% of programmable range.)

0–1 V dc Range ID: 0.25 V =

Range 1, 0.5 V = Range 2, 0.75 V =

Range 3,

1 V = Cal Range.

2-4

Teledyne Analytical Instruments

Image 16
Contents Model 7300A Teledyne Analytical InstrumentsModel 7300A Copyright 2000 Teledyne Analytical InstrumentsInfrared Gas Analyzer Technician Record Sheet Application Impurity of InterestModel 7300A Teledyne Analytical Instruments Model 7300A Installation Table of Contents IntroductionModel 7300A Infrared Gas Analyzer Start-up and Theory of Operation Table of ContentsOperation Electrical/Control Unit Modes/Functioning Maintenance AppendixTypical Gas Applications OverviewInfrared Gas Analyzer Introduction General Main Features of the AnalyzerIntroduction Model 7300A Ndir Analyzer Introduction Model 7300A Teledyne Analytical Instruments Infrared Gas Analyzer Installation Installing and Connecting the AnalyzerUnpacking the Analyzer/Inspection Installation Model 7300A Electrical Power ConnectionsUser Connections Calibration GasesInfrared Gas Analyzer Installation Pipe Connections Electrical Connections Rear PanelSample Delivery System Venting the SystemInstallation Model 7300A Primary Input Power Fuse Installation3 50-Pin Equipment Interface Connector Analog OutputsExamples Pin FunctionOutput V dc Output mA dc Alarm Relays Range Voltage Current mA ApplicationPin Contact Digital Remote Cal InputsRemote Calibration Connections Range ID Relays Remote Valve ConnectorNetwork I/O 4 RS-232 Port FET Series ResistanceParameter Setting Command DescriptionGas Requirements Calibration Calibration Fluids Testing the SystemCalibration Infrared Gas Analyzer Installation Installation Model 7300A Teledyne Analytical Instruments Preliminary Ndir Analyzer StartupInitial Set-up and Zeroing Infrared Gas Analyzer Start-up and OperationOperational Calibration Start-up and Theory of Operation Model 7300ATheory of operation General AnalyzerBlock Diagram of the Model 7300A Electronics Circuit Description Digital Signal Processing & Electronics Linearizer Linearizer Output Linearizer Input Teledyne Analytical Instruments Page Introduction Infrared Gas Analyzer OperationUsing the Controls Analysis ModeOperation Model 7300A Mode/Function SelectionSetup Mode Setup Mode Enter Data EntryEscape Setting up an AUTO-CAL EnterInfrared Gas Analyzer Operation Password Protection Entering the PasswordInstalling or Changing the Password AAASystem Self-Diagnostic Test Logging OutModel Screen Checking Linearity with AlgorithmTroubleshooting information Digital Filter Setup Zero Offset Adjustment CAL-OUT Function Adjst output to 4ma ENT to OK Zero and Span Functions Zero CalAuto Mode Zeroing Manual Mode Zeroing Cell FailureAuto Mode Spanning Span CalManual Mode Spanning Alarms Function InstallationPress enter again to set the alarm setpoints Range Select Function Manual Select/Define Range ScreenAuto Screen Precautions Analyze Function Illustrates these schemes graphicallyProgramming Set Application ScreenOFFST/INVRT ENT Curve Algorithm Screen Checking the linearizationManual Mode Linearization Auto Mode Linearization Special Function Setup Offset OUTPUT/Reversal Output Output Signal ReversalOutput Signal Offset Polarity ReversalGain Preset Maintenance Infrared Gas Analyzer MaintenanceMaintenance Model 7300A Routine MaintenanceFilter System Self Diagnostic Test Ndir Analyzer Measurement CellPower Major Internal ComponentsAnalog PreampCell Assembly Troubleshooting General Trouble Shooting Chart Maintenance Model 7300A Infrared Gas Analyzer Maintenance Maintenance Model 7300A Teledyne Analytical Instruments Infrared Gas Analyzer Appendix Drawing List SpecificationsAppendix Model 7300A Recommended 2-Year Spare Parts List Qty DescriptionAttachment 7300A Infrared Gas Analyzer Appendix