Heat & Glo LifeStyle ESC-42ST owner manual Getting Started, Typical Appliance System

Page 17

4 Installer Guide

Getting Started

A. Typical Appliance System

NOTICE: Illustrations and photos reflect typical installations and are for design purposes only. Illustrations/diagrams are not drawn to scale. Actual product may vary from pictures in manual

VERTICAL TERMINATION CAP (SECTION 10.H)

STORM COLLAR (SECTION 10.F)

HORIZONTAL TERMINATION CAP

(SECTION 10.J).

NON-COMBUSTIBLE ROOF FLASHING

MAINTAINS MINIMUM CLEARANCE

AROUND PIPE (SECTION 10.E.)

VENT PIPE (SECTIONS 7 and 8)

CEILING FIRESTOP ON FLOOR OF ATTIC (SECTION 8.C)

FRAMING/HEADER (SECTION 5)

GAS LINE (SECTION 11)

Figure 4.1 Typical System

VENT PIPE PENETRATES ROOF PREFERABLY WITHOUT AFFECTING ROOF RAFTERS (SECTION 8.B)

ATTIC INSULATION SHIELD (NOT SHOWN) MUST BE USED HERE TO KEEP INSULATION AWAY FROM VENT PIPE IF ATTIC IS INSULATED (SECTION 8.D)

FRAMING HEADED OFF IN CEILING JOISTS (SECTION 8.B AND 8.C)

MANTEL AND MANTEL LEG (SECTION 5.D)

HEARTH EXTENSION (SECTION 5.)

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

17

Image 17
Contents Do Discardnot Model ESC-42STWhat to do if you smell gas Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Warranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Remote Control Fixed Glass AssemblyClear Space Decorative Doors and FrontsModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsGlass Cleaning Exterior and Interior of Installed Glass Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsFrequency As needed Light Bulb MaintenanceTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Board not Shown Attached to Framing and ClearancesSelecting Appliance Location Clearances Minimum Framing DimensionsConstructing the Appliance Chase MIN MAX NON-COMBUSTIBLE Material Fireplace Opening Mantel and Wall ProjectionsCombustible Material Hearth ExtensionVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Top Vent Horizontal TerminationTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Non-Combustible Wall PenetrationPipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationAppliance Package Identification Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Doors Facing MaterialESC-42ST Model Description Elevated Appliance DimensionElevated Hearth Systems TAB Appliance SetupAccessories Clean the ApplianceInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsEmber Lights Install Light BulbsAccent Lights ScrewsNotch Install RefractoryFlange Outer Firebox Flange Refractory ClipsMystic Ember Placement Install Teco-Sil Glass Ember RockLOG Placement Instructions Grate Tine Grate BAR 4 Install Outer Refractory Panels Ember/Mineral Wool PlacementInstall Trim and/or Surround Install MeshAir Shutter Setting Air Shutter SettingsIntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2RF6M RF12M Description Part Number Optional Wire HarnessService Parts Refractory Assembly Log Set AssemblyDescription Comments Part Number Service Parts ListAt Depot Stocked Pre SN#28 IPI Valve Assembly Post SN Contact Information