Heat & Glo LifeStyle ESC-42ST owner manual LOG Placement Instructions

Page 52

J. Install the Log Assembly

Log Set Assembly: LOGS-ESC42ST

For Model: ESC-42ST

LOG PLACEMENT INSTRUCTIONS

CAUTION: Logs are fragile! Carefully remove the logs from the packaging.

1

2

3

4

5

6

7

8

 

9

Figure 1

PILOT

Figure 2

Figure 3

GRATE: Locate the pilot assembly. The pilot assembly is denoted in this instruction by a black or white arrow () on each photo. For the purpose of placing logs according to this instruction, begin with the pilot on the left side. Position grate by locating the four indentations on the bottom refractory. Place grate legs in the indentations as shown in Figure 3.

1

LOG ENGAGES

GRATE TINE

 

 

1

Figure 4

Figure 5 Reverse View

LOG NUMBER 1 (SRV2146-701):Locate the pilot assembly. It should be on the left side of the fireplace. Place log #1 onto the grate and pull forward so that the indentation on the front of the log engages the left grate tine. The “burnt” tip of Log #1 should rest on the burner. The log must NOT block any burner ports. See Figure 4.

2146-936C

52

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

Image 52
Contents What to do if you smell gas Model ESC-42STDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesBoard not Shown Attached to Constructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsElevated Hearth Systems Model Description Elevated Appliance DimensionESC-42ST Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsAt Depot Service Parts ListDescription Comments Part Number Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information