Heat & Glo LifeStyle ESC-42ST owner manual Assemble Slip Sections, Secure the Vent Sections

Page 37

B. Assemble Slip Sections

Slide the inner flue of the slip section into the inner flue of the pipe section and the outer flue of the slip section over the outer flue of the pipe section. See Figure 10.6.

Slide together to the desired length.

Pilot hole

Figure 10.6 Slip Section Pilot Holes

Maintain a 1-1/2 in. (38 mm) overlap between the slip section and the pipe section.

Secure the pipe and slip section with two screws no longer than 1/2 in. (13 mm), using the pilot holes in the slip section. See Figure 10.7.

Figure 10.7 Screws into Slip Section

Continue adding pipe as necessary following instructions in “Assembling Pipe Sections.”

NOTICE: If slip section is too long, the inner and outer flues of the slip section can be cut to the desired length.

C. Secure the Vent Sections

Vertical runs of DVP pipe must be supported every 8 ft. (2.44 m) after the 25 ft. (7.62 m) maximum unsupported rise.

Vertical runs of SLP pipe must be supported every 8 ft. (2.44 m).

Horizontal sections must be supported every 5 feet (1.52 m).

Vent supports or plumbers strap (spaced 120º apart) may be used to support vent sections. See Figures 10.8 and 10.9.

Wall shield firestops may be used to provide horizontal support vent sections.

SLP ceiling firestops have tabs that may be used to provide vertical support.

WARNING! Risk of Fire, Explosion or Asphyxiation!

Improper support may allow vent to sag and separate. Use vent run supports and connect vent sections per in- stallation instructions. DO NOT allow vent to sag below connection point to appliance.

120º

Figure 10.8 Securing Vertical Pipe Sections

120º

Figure 10.9 Securing Horizontal Pipe Sections

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

37

Image 37
Contents What to do if you smell gas Model ESC-42STDo Discardnot Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Warranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Control Fixed Glass AssemblyClear Space Decorative Doors and FrontsModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsGlass Cleaning Exterior and Interior of Installed Glass Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsFrequency As needed Light Bulb MaintenanceTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesBoard not Shown Attached to Constructing the Appliance Chase Minimum Framing DimensionsClearances MIN MAX NON-COMBUSTIBLE Material Fireplace Opening Mantel and Wall ProjectionsCombustible Material Hearth ExtensionVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Top Vent Horizontal TerminationTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Non-Combustible Wall PenetrationPipe DVP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationAppliance Package Identification Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Doors Facing MaterialElevated Hearth Systems Model Description Elevated Appliance DimensionESC-42ST TAB Appliance SetupAccessories Clean the ApplianceInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsEmber Lights Install Light BulbsAccent Lights ScrewsNotch Install RefractoryFlange Outer Firebox Flange Refractory ClipsMystic Ember Placement Install Teco-Sil Glass Ember RockLOG Placement Instructions Grate Tine Grate BAR 4 Install Outer Refractory Panels Ember/Mineral Wool PlacementInstall Trim and/or Surround Install MeshAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2RF6M RF12M Description Part Number Optional Wire HarnessService Parts Refractory Assembly Log Set AssemblyAt Depot Service Parts ListDescription Comments Part Number Stocked Pre SN#28 IPI Valve Assembly Post SN Contact Information