C. Install the Ceiling Firestop

A ceiling firestop MUST be used between floors and attics.

DVP pipe only - Frame an opening 10 in. by 10 in. (254 mm by 254 mm) whenever the vent penetrates a ceiling/floor (see Figure 8.3).

WARNING! Risk of Fire! DO NOT pack insu- lation around the vent. Insulation must be kept back from the pipe to prevent overheating.

 

 

ATTIC ABOVE

 

 

A

 

 

A

 

PIPE

A

 

DVP

10 in. (254 mm)

Figure 8.3

Installing Ceiling Firestop (Generic Fireplace Model Shown)

 

INSTALL ATTIC INSULATION SHIELDS

 

BEFORE OR AFTER INSTALLATION OF VENT SYSTEM

 

3 FASTENERS

 

 

PER SIDE

 

 

CEILING FIRESTOP

CEILING FIRESTOP

 

INSTALLED BELOW CEILING

INSTALLED ABOVE CEILING

 

Figure 8.4 Installing the Attic Shield

 

32

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

 

Image 32
Contents Do Discardnot Model ESC-42STWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideReference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Board not Shown Attached to Framing and ClearancesSelecting Appliance Location Clearances Minimum Framing DimensionsConstructing the Appliance Chase Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsESC-42ST Model Description Elevated Appliance DimensionElevated Hearth Systems Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsDescription Comments Part Number Service Parts ListAt Depot Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information