Heat & Glo LifeStyle ESC-42ST owner manual Top Vent Horizontal Termination Three Elbows

Page 28

1. Top Vent - Horizontal Termination - (continued)

Three Elbows

Note: Must have a 24 inches minimum vertical vent before attaching any elbow to the appliance.

Note: Flue restrictor is permit- ted ONLY on 30 ft. minimum vertical runs with no elbows.

 

V1

 

H1

V2

H2

2 ft

610 mm

7 in

178 mm

*

H2 Max = 2 X V2

3 ft

914 mm

2 ft

610 mm

*

H2 Max = 2 X V2

4 ft

1.2 m

4 ft

1.2 m

*

H2 Max = 2 X V2

5 ft

1.5 m

9 ft

2.7 m

*

H2 Max = 2 X V2

6 ft

1.8 m

12 ft

3.7 m

*

H2 Max = 2 X V2

7 ft

2.1 m

14 ft

4.3 m

*

H2 Max = 2 X V2

10 ft

3.0 m

20 ft

6.1 m

*

H2 Max = 2 X V2

V1 + H1 must be adhered to.

* V2 has no specific restrictions EXCEPT,

Ht max = 2 x Vt and Vtotal + Htotal cannot exceed 60 ft Maximum

H2

V2

H1

V1

Figure 7.5

28

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

Image 28
Contents What to do if you smell gas Model ESC-42STDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesBoard not Shown Attached to Constructing the Appliance Chase Minimum Framing DimensionsClearances Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsElevated Hearth Systems Model Description Elevated Appliance DimensionESC-42ST Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsAt Depot Service Parts ListDescription Comments Part Number Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information