Heat & Glo LifeStyle ESC-42ST owner manual After Fireplace is Lit, Frequently Asked Questions

Page 13

K. After Fireplace is Lit

Initial Break-in Procedure

The fireplace should be run three to four hours continuously on high.

Turn the fireplace off and allow it to completely cool.

Remove fixed glass assembly. See Section 14.A.

Clean fixed glass assembly. See Section 3.

Replace the fixed glass assembly and run continuously on high an additional 12 hours.

This cures the materials used to manufacture the fire- place.

NOTICE! Open windows for air circulation during fire- place break-in.

Some people may be sensitive to smoke and odors.

Smoke detectors may activate.

L.Frequently Asked Questions

ISSUE

SOLUTIONS

 

 

Condensation on the glass

This is a result of gas combustion and temperature variations. As the fireplace warms, this

condensation will disappear.

 

 

 

Blue flames

This is a result of normal operation and the flames will begin to yellow as the fireplace is al-

lowed to burn for 20 to 40 minutes.

 

 

 

 

When first operated, this fireplace may release an odor for the first several hours. This is

Odor from fireplace

caused by the curing of materials from manufacturing. Odor may also be released from

finishing materials and adhesives used near the fireplace. These circumstances may require

 

 

additional curing related to the installation environment.

 

 

Film on the glass

This is a normal result of the curing process of the paint and logs. Glass should be cleaned

within 3 to 4 hours of initial burning. A non-abrasive cleaner such as gas appliance glass

 

 

cleaner may be necessary. See your dealer.

 

 

 

Noise is caused by metal expanding and contracting as it heats up and cools down, similar to

Metallic noise

the sound produced by a furnace or heating duct. This noise does not affect the operation or

 

longevity of the fireplace.

 

 

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

13

Image 13
Contents What to do if you smell gas Model ESC-42STDo Discardnot Homeowner Reference Information CongratulationsUser Guide Table of ContentsTroubleshooting Appliance SetupReference Materials Limited Lifetime Warranty Warranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Remote Control Fixed Glass AssemblyClear Space Decorative Doors and FrontsModule Reset IPI Battery Tray/Battery InstallationNine Hour Safety Shutdown Feature Control Module OperationFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsMaintenance Tasks-Homeowner Maintenance and ServiceGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsGlass Cleaning Exterior and Interior of Installed Glass Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection LogsFrequency As needed Light Bulb MaintenanceTypical Appliance System Getting StartedTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Selecting Appliance Location Framing and ClearancesBoard not Shown Attached to Constructing the Appliance Chase Minimum Framing DimensionsClearances MIN MAX NON-COMBUSTIBLE Material Fireplace Opening Mantel and Wall ProjectionsCombustible Material Hearth ExtensionVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsApproved Pipe Vent Information and DiagramsVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination One Elbow Top Vent Horizontal TerminationTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Pipe Clearances to Combustibles Vent Clearances and FramingWall Penetration Framing Non-Combustible Wall PenetrationPipe DVP Install the Ceiling FirestopFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Top Vent Appliance PreparationAppliance Package Identification Securing and Leveling the ApplianceAttach Vent to the Firebox Assembly Installing Vent PipeAssemble Vent Sections Assemble Pipe SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingInstall Horizontal Termination Cap Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Fuel Conversion Gas InformationGas Pressure Gas ConnectionIntelliFire Plus Ignition System Wiring Wiring RequirementsElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Doors Facing MaterialElevated Hearth Systems Model Description Elevated Appliance DimensionESC-42ST TAB Appliance SetupAccessories Clean the ApplianceInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsEmber Lights Install Light BulbsAccent Lights ScrewsNotch Install RefractoryFlange Outer Firebox Flange Refractory ClipsMystic Ember Placement Install Teco-Sil Glass Ember RockLOG Placement Instructions Grate Tine Grate BAR 4 Install Outer Refractory Panels Ember/Mineral Wool PlacementInstall Trim and/or Surround Install MeshAir Shutter Setting Air Shutter SettingsSymptom Possible Cause Corrective Action TroubleshootingIntelliFire Plus Ignition System Troubleshooting Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2RF6M RF12M Description Part Number Optional Wire HarnessService Parts Refractory Assembly Log Set AssemblyAt Depot Service Parts ListDescription Comments Part Number Stocked Pre SN#28 IPI Valve Assembly Post SN Contact Information