Heat & Glo LifeStyle ESC-42ST owner manual Vent Components Diagrams, DVP-AS2

Page 60

B. Vent Components Diagrams

 

Pipe

Effective Length

 

 

 

Inches

Millimeters

10-1/2 in.

 

 

 

 

Effective

DVP4

4

102

(267 mm)

45 °

Height/Length

DVP6

6

152

 

 

 

 

 

 

DVP12

12

305

4-7/8 in.

 

 

DVP24

24

610

 

(124 mm)

 

 

 

 

 

 

DVP36

36

914

 

10-7/8 in.

DVP Pipe (see chart)

DVP48

48

1219

 

(276 mm)

 

 

 

 

 

DVP45 (45 Elbow)°

 

DVP6A

3 to 6

76 to 152

 

DVP12A

3 to 12

76 to 305

 

 

 

DVP12MI

3 to 12

76 to 305

 

 

 

DVP24MI

3 to 24

76 to 610

 

 

 

 

 

 

 

11-3/8 in.

 

 

 

 

 

(289 mm)

 

10 in.

1 in.

 

 

 

(254 mm)

 

 

 

(25 mm)

 

 

 

 

 

 

 

 

 

 

 

 

7-3/8 in.

 

 

 

 

 

(187 mm)

 

10 in.

 

 

 

1-1/4 in. (32 mm)

(254 mm)

 

 

9-1/4 in.

 

 

 

 

 

 

Assembled

 

 

 

(235 mm)

1/2 in. TYP

Height: 24 in./610 mm

 

 

 

13-1/4 in.

(13 mm)

Diameter: 10 in./254 mm

 

 

 

 

 

 

 

(337 mm)

 

 

 

 

 

 

DVP-AS2

DVP-FS (Ceiling Firestop)

DVP90ST (90° Elbow)

 

 

 

 

 

 

 

 

12 in.

1 in.

 

 

 

 

(305 mm)

(25 mm)

10 in.

1- 1/2 in.

 

 

 

8 in.

 

 

 

(203 mm)

(254 mm)

(38 mm)

 

14 in.

 

 

 

 

 

 

 

UP

 

 

(356 mm)

 

 

 

 

 

 

5 in.

12 in.

 

 

 

 

(127 mm)

(305 mm)

 

 

 

 

 

 

 

 

6 in.

 

 

 

 

 

(152 mm)

 

DVP-HVS (Vent Support)

 

 

DVP-WS (Wall Shield Firestop)

Figure 16.2 DVP vent components

 

 

 

 

 

60

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

 

Image 60
Contents Model ESC-42ST What to do if you smell gasDo Discardnot Congratulations Homeowner Reference InformationTable of Contents User GuideAppliance Setup TroubleshootingReference Materials Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Framing and Clearances Selecting Appliance LocationBoard not Shown Attached to Minimum Framing Dimensions Constructing the Appliance ChaseClearances Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Vertical Termination Cap Install Horizontal Termination CapHeat Shield Requirements for Horizontal Termination Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsModel Description Elevated Appliance Dimension Elevated Hearth SystemsESC-42ST Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsTroubleshooting Symptom Possible Cause Corrective ActionIntelliFire Plus Ignition System Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsService Parts List At DepotDescription Comments Part Number Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information