Heat & Glo LifeStyle ESC-42ST owner manual Securing and Leveling the Appliance

Page 35

REFRACTORY ASSEMBLY

MESH ASSEMBLY

EMBER GLASS ROCK (TECO-SIL)

MANUAL BAG ASSEMBLY

LOG PACKAGING

Figure 9.6 Appliance Package Identification.

Attach the non-combustible board to the appliance and wall framing with the screws supplied in the manual bag assembly. See Figure 9.7

NON-COMBUSTIBLE

BOARD

FINISHING STRIPS

Figure 9.7 Attaching Non-Combustible Board

B. Securing and Leveling the Appliance

WARNING! Risk of Fire! Prevent contact with:

Sagging or loose insulation

Insulation backing or plastic

Framing and other combustible materials

Block openings into the chase to prevent entry of blown- in insulation. Make sure insulation and other materials are secured.

DO NOT notch the framing around the appliance standoffs.

Failure to maintain air space clearance may cause overheating and fire.

The diagram shows how to properly position and secure the appliance (see Figure 9.8). Nailing tabs are provided to secure the appliance to the framing members.

Bend out nailing tabs on each side.

Place the appliance into position.

Keep nailing tabs flush with the framing.

Level the appliance from side to side and front to back.

Shim the appliance as necessary. It is acceptable to use wood shims underneath the appliance.

Secure the appliance to the framing by using nails or screws through the nailing tabs.

Secure the appliance to the floor by inserting two screws through the pilot holes at the bottom of the appliance.

Figure 9.8 Proper positioning, leveling and securing of an appliance

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

35

Image 35
Contents Do Discardnot Model ESC-42STWhat to do if you smell gas Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Warranty Conditions Limited Lifetime WarrantyListing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Decorative Doors and Fronts Fixed Glass AssemblyRemote Control Clear SpaceControl Module Operation IPI Battery Tray/Battery InstallationModule Reset Nine Hour Safety Shutdown FeatureFinal inspection by Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsDoors, Surrounds, Fronts Maintenance and ServiceMaintenance Tasks-Homeowner Glass Cleaning Exterior of Installed Glass OnlyLogs Maintenance Tasks-Qualified Service TechnicianGlass Cleaning Exterior and Interior of Installed Glass Gasket Seal and Glass Assembly InspectionFrequency As needed Light Bulb MaintenanceTypical Appliance System Getting StartedInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Board not Shown Attached to Framing and ClearancesSelecting Appliance Location Clearances Minimum Framing DimensionsConstructing the Appliance Chase MIN MAX NON-COMBUSTIBLE Material Fireplace Opening Mantel and Wall ProjectionsCombustible Material Hearth ExtensionVent Termination Minimum Clearances Termination LocationsInches U.S.A Covered Alcove ApplicationsUse of Elbows Vent Information and DiagramsApproved Pipe Vent Table KeyVent Diagrams H1+ H2 Top Vent Horizontal TerminationTop Vent Horizontal Termination One Elbow Two ElbowsTop Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Non-Combustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe DVP Install the Ceiling FirestopVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Top Vent Appliance PreparationAppliance Package Identification Securing and Leveling the ApplianceAssemble Pipe Sections Installing Vent PipeAttach Vent to the Firebox Assembly Assemble Vent SectionsSecure the Vent Sections Assemble Slip SectionsDisassemble Vent Sections 10 Rotate Seams for DisassemblyAssemble and Install Storm Collar Install Metal Roof FlashingHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Gas Connection Gas InformationFuel Conversion Gas PressureElectrical Information Wiring RequirementsIntelliFire Plus Ignition System Wiring Electrical Service and Repair Junction Box InstallationIPI Wiring Diagram Finishing Doors Facing MaterialESC-42ST Model Description Elevated Appliance DimensionElevated Hearth Systems TAB Appliance SetupRemove the Shipping Materials Clean the ApplianceAccessories Installing the Optional Heat-ZoneGas KitScrews Install Light BulbsEmber Lights Accent LightsOuter Firebox Flange Refractory Clips Install RefractoryNotch FlangeMystic Ember Placement Install Teco-Sil Glass Ember RockLOG Placement Instructions Grate Tine Grate BAR 4 Install Outer Refractory Panels Ember/Mineral Wool PlacementAir Shutter Settings Install MeshInstall Trim and/or Surround Air Shutter SettingIntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Reference Materials Appliance Dimension DiagramDVP-AS2 Vent Components DiagramsDVP-TRAP DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2RF6M RF12M Description Part Number Optional Wire HarnessService Parts Refractory Assembly Log Set AssemblyDescription Comments Part Number Service Parts ListAt Depot Stocked Pre SN#28 IPI Valve Assembly Post SN Contact Information