B. Constructing the Appliance Chase

A chase is a vertical box-like structure built to enclose the gas appliance and/or its vent system. In cooler climates the vent should be enclosed inside the chase.

NOTICE: Treatment of ceiling firestops and wall shield firestops and construction of the chase may vary with the type of building. These instructions are not substitutes for the requirements of local building codes. Therefore, you MUST check local building codes to determine the requirements to these steps.

Chases should be constructed in the manner of all out- side walls of the home to prevent cold air drafting prob- lems. The chase should not break the outside building envelope in any manner.

Walls, ceiling, base plate and cantilever floor of the chase should be insulated. Vapor and air infiltration barriers should be installed in the chase as per regional codes for the rest of the home. Additionally, in regions where cold air infiltration may be an issue, the inside surfaces may be sheetrocked and taped for maximum air tightness.

To further prevent drafts, the wall shield and ceiling fire- stops should be caulked with caulk with a minimum of 300ºF continuous exposure rating to seal gaps. Gas line holes and other openings should be caulked with caulk with a minimum of 300ºF continuous exposure rating or stuffed with unfaced insulation. If the appliance is being installed on a cement surface, a layer of plywood may be placed underneath to prevent conducting cold up into the room.

C. Clearances

NOTICE: Install appliance on hard metal or wood surfaces extending full width and depth. DO NOT install directly on carpeting, vinyl, tile or any combustible material other than wood.

WARNING! Risk of Fire! Maintain specified air space clearances to appliance and vent pipe:

Insulation and other materials must be secured to prevent accidental contact.

The chase must be properly blocked to prevent blown insulation or other combustibles from entering and making contact with fireplace or chimney.

Failure to maintain airspace may cause overheating and a fire.

B

C

D

A

E=43 IN. E=33 IN.

F

IG

H

MINIMUM FRAMING DIMENSIONS*

 

A

B**

C*

D

 

E

F**

G**

H

I

 

Rough

Rough

Rough

Rough

Clearance

 

Clearance

 

 

 

 

 

 

to ceiling

Combustible

Combustible

Sides of

Front of

 

Opening

Opening

Opening

Opening

to ceiling

 

 

 

from top of

Floor

Flooring

Appliance

Appliance

 

(Vent Pipe)

(Height)

(Depth)

(Width)

from opening

 

 

 

appliance

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Inches

10

46-1/2

30

60-1/4

43

 

33

0

See Note Below

1

36

 

 

 

 

 

 

 

 

 

 

 

 

Millime-

254

1181

762

1530

1092

 

838

0

See Note Below

25

914

ters

 

 

 

 

 

 

 

 

 

 

 

 

*Adjust framing dimensions for interior sheathing (such as sheetrock)

**Fireplace may need to be elevated from the floor affecting framing height B, depending on hearth construction. See Section 5.E for hearth and combustible floor requirements.

Figure 5.2 Clearances to Combustibles

20

Heat & Glo • ESC-42ST2146-900 Rev. o • 5/12

Image 20
Contents Do Discardnot Model ESC-42STWhat to do if you smell gas Congratulations Homeowner Reference InformationTable of Contents User GuideReference Materials Appliance SetupTroubleshooting Limited Lifetime Warranty Limited Lifetime Warranty Warranty ConditionsListing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsYour Fireplace Gas Fireplace SafetyOperating Instructions User Guide Fixed Glass Assembly Remote ControlClear Space Decorative Doors and FrontsIPI Battery Tray/Battery Installation Module ResetNine Hour Safety Shutdown Feature Control Module OperationLighting Instructions IPI Final inspection byFrequently Asked Questions After Fireplace is LitMaintenance and Service Maintenance Tasks-HomeownerGlass Cleaning Exterior of Installed Glass Only Doors, Surrounds, FrontsMaintenance Tasks-Qualified Service Technician Glass Cleaning Exterior and Interior of Installed GlassGasket Seal and Glass Assembly Inspection LogsLight Bulb Maintenance Frequency As neededGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Board not Shown Attached to Framing and ClearancesSelecting Appliance Location Clearances Minimum Framing DimensionsConstructing the Appliance Chase Mantel and Wall Projections MIN MAX NON-COMBUSTIBLE Material Fireplace OpeningHearth Extension Combustible MaterialTermination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Inches U.S.AVent Information and Diagrams Approved PipeVent Table Key Use of ElbowsVent Diagrams Top Vent Horizontal Termination Top Vent Horizontal Termination One ElbowTwo Elbows H1+ H2Top Vent Horizontal Termination Three Elbows 12 ft V1 + V2 + H1 = 50 ft 15.2 m Max Ht Max Vent Clearances and Framing Pipe Clearances to CombustiblesWall Penetration Framing Non-Combustible Wall PenetrationInstall the Ceiling Firestop Pipe DVPVaulted Ceiling Installation Install Attic Insulation ShieldFlat Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Appliance Package IdentificationInstalling Vent Pipe Attach Vent to the Firebox AssemblyAssemble Vent Sections Assemble Pipe SectionsAssemble Slip Sections Secure the Vent Sections10 Rotate Seams for Disassembly Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarHeat Shield Requirements for Horizontal Termination Install Vertical Termination CapInstall Horizontal Termination Cap Gas Information Fuel ConversionGas Pressure Gas ConnectionWiring Requirements IntelliFire Plus Ignition System WiringElectrical Service and Repair Junction Box Installation Electrical InformationIPI Wiring Diagram Finishing Facing Material DoorsESC-42ST Model Description Elevated Appliance DimensionElevated Hearth Systems Appliance Setup TABClean the Appliance AccessoriesInstalling the Optional Heat-ZoneGas Kit Remove the Shipping MaterialsInstall Light Bulbs Ember LightsAccent Lights ScrewsInstall Refractory NotchFlange Outer Firebox Flange Refractory ClipsInstall Teco-Sil Glass Ember Rock Mystic Ember PlacementLOG Placement Instructions Grate BAR Grate Tine 4 Ember/Mineral Wool Placement Install Outer Refractory PanelsInstall Mesh Install Trim and/or SurroundAir Shutter Setting Air Shutter SettingsIntelliFire Plus Ignition System TroubleshootingSymptom Possible Cause Corrective Action Troubleshooting Appliance Dimension Diagram Reference MaterialsVent Components Diagrams DVP-AS2DVP-TRAP1 DVP-TRAP2 DVP-TRAPK1 DVP-TRAPK2 DVP-TRAPRF6M RF12M Optional Wire Harness Description Part NumberRefractory Assembly Log Set Assembly Service PartsDescription Comments Part Number Service Parts ListAt Depot Pre SN Stocked#28 IPI Valve Assembly Post SN Contact Information